STATELIVE DATA

Nevada government bids, RFPs and contracts

Nevada
Open bids
6+
1 due this week
Pre-RFPs
107
1 this month
Agencies
1,555
Projects
405
In 14 counties
1 bid due this weekNov 12

6+ bids are open in Nevada. Get the next ones earlier.

Track Nevada free

Free account · 30-second setup · No credit card

THE 30-SECOND BRIEF

What's planned

Capital Projects, Grants and Information Technology lead the 107 pre-RFPs Civic IQ has found in Nevada council minutes and budgets.

Who's buying

Nevada State Public Works Division | State of Nevada, University Of Nevada-Las Vegas and City of North Las Vegas have the most open bids right now.

What's due

1 bid closes this week. Next up: University of Nevada-Las Vegas Greenspun College of Urban Affairs Cooling Tower Repairs - 5587-GS, University Of Nevada-Las Vegas, due Nov 12, 2026.

Bids closing soon

6+ open across 5 agencies, soonest deadline first.

What Nevada agencies are planning

Upcoming projects, grants and hiring found in council minutes and budget hearings, before the solicitation.

OpportunityTruckee Meadows Water Authority and the City of Reno are moving into full delivery on the $260M Advanced Purified Water Facility at American Flat, Nevada’s first Category A+ potable reuse project. The May 27, 2026 staff report details a $224.7M CMAR construction contract, $289.9M total program cost, and a multi-source funding stack with significant federal and state SRF support. With design, permits, land, and financing in place, remaining needs center on controls, systems integration, testing, analytics, security, and long-term O&M support.Truckee Meadows Water Authority · May 27, 2026$289,871,094OpportunityThe Rock McCarran Flood Mitigation Project has a 30% design-level Opinion of Probable Construction Cost prepared by J-U-B Engineers, outlining a large combined flood control and recreation works package. The draft cost estimate breaks the project into civil site work, transportation, and recreation components with a base estimate of 92596000 and a base-plus-supplemental estimate of 104209000, including levees, a concrete floodwall, riprap, toe drains, utilities, roadway and signal work, multi-use trails, and a significant recreation park with fields, playgrounds, restrooms, lighting, and site furnishings. This level of detail shows the owner is moving from conceptual planning into scoping a major construction bid schedule but has not yet gone out to bid or selected contractors. Vendors in heavy civil construction, sports field and playground construction, landscaping, traffic signals, utilities, and related specialties can begin positioning as prime or subcontractors, as well as offering value engineering or constructability input while designs are still only 30% complete. A practical next step is to engage the sponsoring flood control/parks/public works agency to understand anticipated phasing, procurement method, and prequalification requirements for this 90M+ program.Truckee River Flood Management Authority · Jun 13, 2026$104,209,000OpportunityThe Truckee River Flood Management Authority reviewed the 30% design report from J-U-B Engineering for the Rock to McCarran Reach Flood Project, a 170-acre levee, floodplain, and recreation complex including 11 sports fields, trails, and extensive riparian restoration. The current opinion of probable construction cost for the full buildout is about 104209000, which exceeds the roughly 95000000 financial comfort threshold in TRFMA’s strategic plan, prompting development of a phased approach and value engineering options. The Technical Advisory Committee has recommended accepting the 30% design and moving forward to 60%, and staff is asking the Board for direction on phasing decisions such as parking quantities, lighting, and supplemental park features, as well as acceptance of a short floodwall segment constrained by utilities and private property. No construction procurement has been authorized yet; the project is still in design and scope refinement under an existing 3588000 time-and-materials design contract partially offset by a 1175000 FEMA grant. This creates an upcoming window for civil, environmental, recreation, and construction vendors to influence scope, phasing, and standards ahead of a large construction bid package.Truckee River Flood Management Authority · Jun 12, 2026$104,209,000OpportunityTRFMA and its Technical Advisory Committee have completed and reviewed the 30% design for the Rock to McCarran Reach Flood Project and recommended advancing it to 60% design. The project, led by J‑U‑B Engineers, covers roughly 100 acres of restored floodplain and open space, levees, berms, floodplain terracing, side channels, river access, trails, and flood‑compatible recreation fields between Rock Boulevard and McCarran Boulevard in Reno, with a planning‑level construction cost estimated around 93–104 million depending on recreation enhancements. The Board agenda includes a 30% design report presentation on June 12, 2026, and public outreach workshops occurred June 3, indicating the design is still being refined and no construction contractor has been selected. This is a major capital project with future packages for heavy civil construction, habitat restoration, trail and park build‑out, and long‑term maintenance, so vendors can still influence design details, phasing, and procurement strategy before bids are issued.Truckee River Flood Management Authority · Jun 12, 2026$104,000,000103 more pre-RFPs matched to you in a free digestGet matches free →

Recent projects and awards in Nevada

Contract awards and project updates from public meetings, largest and newest first.

Browse by county

Government agencies in Nevada

1,555 agencies tracked, with procurement data, contacts and vendors.

Questions about Nevada

How do I find government contracts in Nevada?

There are 405 tracked government projects across 1,555 agencies in 14 Nevada counties. The most active procurement sectors include Capital Projects, Information Technology, and Professional Services. Browse active RFPs, pre-RFPs from board meetings, vendor contracts, and decision-maker contacts, all in one place. Filter by county, sector, or agency to find the most relevant opportunities.

Which counties have the most procurement activity in Nevada?

The counties with the most government procurement activity in Nevada are: Washoe County (76 projects), Clark County (62 projects), Lyon County (50 projects), Carson City (45 projects), and Douglas County (39 projects). These counties represent the highest concentration of contract awards, RFPs, and pre-RFPs in the state. You can drill into any county to see active projects, agency contacts, and competitive intelligence, focusing your business development on the highest-opportunity areas.

What types of agencies issue RFPs in Nevada?

Government agencies across Nevada that issue RFPs include Cities & Towns, Government Agencies, Special Districts, County Governments, and School Districts. With 1,555 agencies tracked across 14 counties, Nevada has a diverse procurement landscape. Each agency manages its own RFP process and vendor relationships independently.

How do I bid on Nevada government projects?

To bid on government projects in Nevada, start by registering as a vendor with the specific agency. Most agencies in NV publish formal RFPs on their websites and the state procurement portal. Right now, there are 405 tracked projects across Nevada. The key advantage is getting in early. Pre-RFPs from board meetings can surface 6–18 months before RFPs go live, giving you time to build relationships while projects are still being scoped.

Show 3 more questions

What sectors are most active in Nevada?

Based on tracked procurement activity, the most active sectors in Nevada are: Capital Projects (77 projects), Information Technology (45 projects), Professional Services (44 projects), Insurance (35 projects), and Environmental Services (24 projects). Across 24 active sectors statewide, Detailed breakdowns by sector, county, agency, and contract value help you target the highest-value opportunities and understand competitive dynamics across the state.

Who are the key decision-makers in Nevada?

Procurement decisions in Nevada are made by individual agency leaders such as city managers, county administrators, school superintendents, and department heads, across 1,555 agencies in 14 counties. Each agency has its own purchasing authority and approval process. Verified contact details for decision-makers across Nevada agencies help you reach the right person at the right time.

How active is procurement in Nevada right now?

Nevada is actively procuring. 44 new projects have been surfaced in the last 90 days across the state's 14 counties. The most active sectors recently include Capital Projects, Information Technology, and Professional Services. This level of activity means new opportunities surface regularly. Real-time alerts ensure you never miss a window, whether it's a pre-RFP discussion at a school board meeting or a formal solicitation from a county government.

Work in government? Get Civic IQ free →

Start finding government buyers today.
It's free.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Get started free

No credit card required