Kansas Department of Transportation - Milling and HMA Overlay, K-68 - K068-106 KA 8116-01, 2026
- Due
- Nov 18, 2026
- 12 days left
- Posted
- Oct 20, 2026
- Duration
- 2 months
The 30-second brief
The Kansas Department of Transportation is seeking bids for milling and hot mix asphalt (HMA) overlay work on K-68 (Host Project K068-106 KA 8116-01, including KA 8117-01 in Franklin County and KA 8118-01 in Miami County, spanning a net length of 14.5 miles). The project involves HMA overlay (SR-12.5A, PG 70-28), surface recycling (1.5"), milling, pavement edge wedge (rock), milled centerline rumble strips, pavement markings, quality control testing (HMA), traffic control, and mobilization. The submission deadline is November 18, 2026, at 1:00 PM Local Time via Bid Express (bidx.com). Contractors must be prequalified with KDOT, possess a current Kansas Department of Revenue Tax Clearance Certificate, and comply with state minimum wage rates for Franklin and Miami Counties.
HMA overlay (SR-12.5A) (PG 70-28), Surface recycling (1.5"), Milling, Pavement edge wedge (rock), Rumble strips (milled) (asphalt) (centerline), Pavement marking (multi-component) (white/yellow), Pavement marking (intersection grade) (white), Pavement mrk sym (thermoplastic) (left/rt arrow), Quality control testing (hma), Emulsified asphalt (ss-1hp), Asphalt rejuvenating agent, Traffic control, Mobilization
Price
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The Kansas Department of Transportation is seeking bids for milling and hot mix asphalt (HMA) overlay work on K-68 (Host Project K068-106 KA 8116-01, including KA 8117-01 in Franklin County and KA 8118-01 in Miami County, spanning a net length of 14.5 miles).
The project involves HMA overlay (SR-12.5A, PG 70-28), surface recycling (1.5"), milling, pavement edge wedge (rock), milled centerline rumble strips, pavement markings, quality control testing (HMA), traffic control, and mobilization. The submission deadline is November 18, 2026, at 1:00 PM Local Time via Bid Express (bidx.com). Contractors must be prequalified with KDOT, possess a current Kansas Department of Revenue Tax Clearance Certificate, and comply with state minimum wage rates for Franklin and Miami Counties.
EVALUATION CRITERIA
Price
REQUIRED DELIVERABLES
13- HMA overlay (SR-12.5A) (PG 70-28)
- Surface recycling (1.5")
- Milling
- Pavement edge wedge (rock)
- Rumble strips (milled) (asphalt) (centerline)
- Pavement marking (multi-component) (white/yellow)
- Pavement marking (intersection grade) (white)
- Pavement mrk sym (thermoplastic) (left/rt arrow)
- Quality control testing (hma)
- Emulsified asphalt (ss-1hp)
- Asphalt rejuvenating agent
- Traffic control
- Mobilization
REQUIRED ATTACHMENTS
Certification-Noncollusion & History of Debarment, Certification-Financial Prequalification Amount, Declaration-Limitations on Use of Federal Funds for Lobbying, Certification-Contractual Services with a Current Legislator or a Current Legislator's Firm, Kansas Department of Revenue Tax Clearance Certificate, bid bond
- Submit to
- http://www.bidx.com
- Scope location
- Statewide, KS
- Reported agency
- Kansas Department of Transportation
Questions about this BID
How do I respond to this Bid from Kansas Department of Transportation | State of Kansas?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 18, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: http://www.bidx.com.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Kansas Department of Transportation | State of Kansas in KS, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: HMA overlay (SR-12.5A) (PG 70-28), Surface recycling (1.5"), Milling, Pavement edge wedge (rock), Rumble strips (milled) (asphalt) (centerline), Pavement marking (multi-component) (white/yellow), Pavement marking (intersection grade) (white), Pavement mrk sym (thermoplastic) (left/rt arrow), Quality. Proposals should clearly address how each deliverable will be met.
Show 6 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Price" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Kansas Department of Transportation | State of Kansas?
All active and historical solicitations from Kansas Department of Transportation | State of Kansas are tracked and searchable. As a state agency, Kansas Department of Transportation | State of Kansas regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 2 months. Contract terms may include renewal options.
Is this solicitation still open for submissions?
Based on the posted deadline of November 18, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Certification-Noncollusion & History of Debarment, Certification-Financial Prequalification Amount, Declaration-Limitations on Use of Federal Funds for Lobbying, Certification-Contractual Services wit. Review the full document from Kansas Department of Transportation | State of Kansas for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Statewide, KS. Review the full solicitation for detailed scope requirements.