The City of Milton is seeking bids for the construction and installation of an effluent discharge system divided across three contracts. The work includes installing approximately 35,430 LF of 20" SDR 26 PVC pressure pipe, gate valves, air relief valves, tees, and associated fittings, as well as constructing a triplex pumping station in a pre-cast concrete building, a 7.5 million gallon wet-lined wet-weather storage pond, splitter box, yard piping, site fencing, electrical conduit/wiring, transfer switches, and a natural gas engine-driven generator set. Site improvements include sprayfield piping, valve and sprinkler assemblies, earth moving, dewatering, trenching, structural steel framing, and concrete admixtures. Federal funding applies. Submission deadline is December 17, 2026, with questions due by December 3, 2026.
35, 430 LF of 20" SDR 26 PVC pressure pipe, Gate valves, Air relief valves, Tees, And associated fittings; triplex pumping station housed within a pre-cast fabricated concrete building; 7.5 million gallon wet-lined wet-weather storage pond; splitter box; yard piping; site fencing; electrical conduit/wiring; manual/automatic transfer switches; natural gas engine-driven generator set
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The City of Milton is seeking bids for the construction and installation of an effluent discharge system divided across three contracts.
The work includes installing approximately 35,430 LF of 20" SDR 26 PVC pressure pipe, gate valves, air relief valves, tees, and associated fittings, as well as constructing a triplex pumping station in a pre-cast concrete building, a 7.5 million gallon wet-lined wet-weather storage pond, splitter box, yard piping, site fencing, electrical conduit/wiring, transfer switches, and a natural gas engine-driven generator set. Site improvements include sprayfield piping, valve and sprinkler assemblies, earth moving, dewatering, trenching, structural steel framing, and concrete admixtures. Federal funding applies. Submission deadline is December 17, 2026, with questions due by December 3, 2026.
REQUIRED DELIVERABLES
9- 35, 430 LF of 20" SDR 26 PVC pressure pipe, Gate valves, Air relief valves, Tees, And associated fittings
- Triplex pumping station housed within a pre-cast fabricated concrete building
- 7.5 million gallon wet-lined wet-weather storage pond
- Splitter box
- Yard piping
- Site fencing
- Electrical conduit/wiring
- Manual/automatic transfer switches
- Natural gas engine-driven generator set
- Submit to
- 6738 Dixon St PO Box 909, Milton, FL, 32570
- Scope location
- Santa Rosa, FL
Questions about this BID
How do I respond to this Bid from City of Milton?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 17, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: 6738 Dixon St PO Box 909, Milton, FL, 32570. For questions, contact MIchele Williams.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including City of Milton in FL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is MIchele Williams at (850) 983-5438. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: 35, 430 LF of 20" SDR 26 PVC pressure pipe, Gate valves, Air relief valves, Tees, And associated fittings; triplex pumping station housed within a pre-cast fabricated concrete building; 7.5 million gallon wet-lined wet-weather storage pond; splitter box; yard piping; site fencing; electrical conduit. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
Where can I find more RFPs from City of Milton?
All active and historical solicitations from City of Milton are tracked and searchable. As a city agency, City of Milton regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of December 17, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from City of Milton for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Santa Rosa, FL. Review the full solicitation for detailed scope requirements.