Stockton Unified School District - SUSD Musical Instrument Repair & Storage Facility Modernization - 2025-17
- Due
- Jan 26, 2026
- Deadline passed
- Posted
- Jan 26, 2026
The 30-second brief
Modernization of the SUSD Musical Instrument Repair Facility and Portables 610-615 at 349 E. Vine Street, Stockton, CA. Scope includes floor, wall, and ceiling finishes, lighting replacements, construction of a new restroom and a new paint booth in the main facility, relocation of existing equipment from Cesar Chavez High School, fabrication and installation of a shade structure, accessible ramps, loading dock, new air compressor, electrical and mechanical improvements, exterior painting, new concrete and AC paving, new accessible parking, chainlink fencing, and irrigation and landscape improvements. Mandatory pre-bid conference and site visit took place on Wednesday, January 21, 2026. Bids are due by January 26, 2026.
Modernization of SUSD musical repair facility and portables 610-615; floor, Wall, And ceiling finishes; lighting replacements; new restroom construction; new paint booth construction; relocation of equipment from Cesar Chavez High School; fabrication and installation of shade structure, Accessible ramps, And loading dock; new air compressor installation; electrical and mechanical improvements; exterior painting; new concrete and AC paving; accessible parking; chainlink fencing; irrigation and landscape improvements
Hear what Stockton Unified plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Modernization of the SUSD Musical Instrument Repair Facility and Portables 610-615 at 349 E. Vine Street, Stockton, CA. Scope includes floor, wall, and ceiling finishes, lighting replacements, construction of a new restroom and a new paint booth in the main facility, relocation of existing equipment from Cesar Chavez High School, fabrication and installation of a shade structure, accessible ramps, loading dock, new air compressor, electrical and mechanical improvements, exterior painting, new concrete and AC paving, new accessible parking, chainlink fencing, and irrigation and landscape improvements.
Mandatory pre-bid conference and site visit took place on Wednesday, January 21, 2026. Bids are due by January 26, 2026.
REQUIRED DELIVERABLES
14- Modernization of SUSD musical repair facility and portables 610-615
- Floor, Wall, And ceiling finishes
- Lighting replacements
- New restroom construction
- New paint booth construction
- Relocation of equipment from Cesar Chavez High School
- Fabrication and installation of shade structure, Accessible ramps, And loading dock
- New air compressor installation
- Electrical and mechanical improvements
- Exterior painting
- New concrete and AC paving
- Accessible parking
- Chainlink fencing
- Irrigation and landscape improvements
REQUIRED ATTACHMENTS
5- Mandatory Pre-Bid Conference Sign-in Sheet
- Document 00 41 13 Bid Form and Proposal
- AD 01 - A01
- AD 01 - A02
- Construction Drawings
- Submit to
- Stockton Unified School District, 56 S Lincoln St., Stockton, CA 95203
- Scope location
- Stockton, CA
- Reported agency
- Stockton Unified School District
Questions about this BID
How do I respond to this Bid from Stockton Unified?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is January 26, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: Stockton Unified School District, 56 S Lincoln St., Stockton, CA 95203.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Stockton Unified in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: Modernization of SUSD musical repair facility and portables 610-615; floor, Wall, And ceiling finishes; lighting replacements; new restroom construction; new paint booth construction; relocation of equipment from Cesar Chavez High School; fabrication and installation of shade structure, Accessible r. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from Stockton Unified?
All active and historical solicitations from Stockton Unified are tracked and searchable. As a school agency, Stockton Unified regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Mandatory Pre-Bid Conference Sign-in Sheet, Document 00 41 13 Bid Form and Proposal, AD 01 - A01, AD 01 - A02, Construction Drawings. Review the full document from Stockton Unified for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Stockton, CA. Review the full solicitation for detailed scope requirements.