BIDCLOSED
Save

Prestonwood Forest Utility District Wastewater Treatment Plant Motor Control Center Replacement Bid

Prestonwood Forest Utility District
Due
Feb 10, 2026
Deadline passed

The 30-second brief

What they're buying

Prestonwood Forest Utility District is seeking bids for the replacement of a wastewater treatment plant motor control center, including a new elevated galvanized steel platform and floor coating. Bids are due February 10, 2026.

What you must deliver

Removal and disposal of existing motor control center, Installation of new motor control center, Application of floor coating system

Hear what Prestonwood Forest Utility District plans next before it's posted.

Get alerts free

Free account · 30-second setup · No credit card

Summary

Prestonwood Forest Utility District is seeking bids for the replacement of a wastewater treatment plant motor control center, including a new elevated galvanized steel platform and floor coating. Bids are due February 10, 2026.

REQUIRED DELIVERABLES

3
  • Removal and disposal of existing motor control center
  • Installation of new motor control center
  • Application of floor coating system
Submit to
1415 Louisiana, 5th Floor, Houston, TX, 77002-7349
Scope location
Harris, TX

Questions about this BID

How do I respond to this Bid from Prestonwood Forest Utility District?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is February 10, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: 1415 Louisiana, 5th Floor, Houston, TX, 77002-7349.

Can small businesses or minority-owned firms bid on this Bid?

Most government agencies, including Prestonwood Forest Utility District in TX, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the Bid submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

What are the key deliverables?

The solicitation specifies the following deliverables: Removal and disposal of existing motor control center, Installation of new motor control center, Application of floor coating system. Proposals should clearly address how each deliverable will be met.

Show 3 more questions

Where can I find more RFPs from Prestonwood Forest Utility District?

All active and historical solicitations from Prestonwood Forest Utility District are tracked and searchable. As a utility district agency, Prestonwood Forest Utility District regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What documents are required to bid on this Bid?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Prestonwood Forest Utility District for the complete list.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: Harris, TX. Review the full solicitation for detailed scope requirements.

Work in government? Get Civic IQ free →

Start finding government buyers today.
It's free.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Get started free

No credit card required