The 30-second brief
Provide seismic cone penetration testing with pore water pressure measurement (SCPTu) as part of a geotechnical investigation at a site known to be underlain by diatomaceous soils. This is a joint research project with ODOT, OSU, and PSU at Wikiup Junction, US Route 97, Milepost 165.7. The work includes advancing SCPTu soundings (estimated 750 to 1,500 total feet), downhole shear wave velocity measurements at 1-m intervals, pore water pressure dissipation tests, and variable penetration rate testing. Contractor shall furnish all necessary equipment, machinery, tools, lighting, supplies, materials, fuel, mobilization, and skilled personnel. Submission deadline is October 15, 2026. Compensation will be based on fixed unit prices.
Administration, Mobilization, Cone Penetrating Testing with sounding report, U2 Dissipation Tests, Shear Wave Velocity Test - 1-m Intervals, Per Diem, CPT Overtime
Lowest Responsible Bidder
Hear what Oregon Department of Transportation | ACEC-ODOT Partnership plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Provide seismic cone penetration testing with pore water pressure measurement (SCPTu) as part of a geotechnical investigation at a site known to be underlain by diatomaceous soils.
This is a joint research project with ODOT, OSU, and PSU at Wikiup Junction, US Route 97, Milepost 165.7. The work includes advancing SCPTu soundings (estimated 750 to 1,500 total feet), downhole shear wave velocity measurements at 1-m intervals, pore water pressure dissipation tests, and variable penetration rate testing. Contractor shall furnish all necessary equipment, machinery, tools, lighting, supplies, materials, fuel, mobilization, and skilled personnel. Submission deadline is October 15, 2026. Compensation will be based on fixed unit prices.
EVALUATION CRITERIA
Lowest Responsible Bidder
REQUIRED DELIVERABLES
7- Administration
- Mobilization
- Cone Penetrating Testing with sounding report
- U2 Dissipation Tests
- Shear Wave Velocity Test - 1-m Intervals
- Per Diem
- CPT Overtime
REQUIRED ATTACHMENTS
6- Bid Pricing Form
- Bid Cover Sheet
- References
- W-9 Form
- Responsibility Inquiry Form
- Certification Regarding Debarment
- Submit to
- https://oregonbuys.gov/bso
- Scope location
- Salem, OR
- Reported agency
- Department of Transportation
Questions about this BID
How do I respond to this Bid from Oregon Department of Transportation | ACEC-ODOT Partnership?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is October 15, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: https://oregonbuys.gov/bso. For questions, contact David Dethloff.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Oregon Department of Transportation | ACEC-ODOT Partnership in OR, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is David Dethloff at (503) 569-8793. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Administration, Mobilization, Cone Penetrating Testing with sounding report, U2 Dissipation Tests, Shear Wave Velocity Test - 1-m Intervals, Per Diem, CPT Overtime. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Lowest Responsible Bidder" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Oregon Department of Transportation | ACEC-ODOT Partnership?
All active and historical solicitations from Oregon Department of Transportation | ACEC-ODOT Partnership are tracked and searchable. As a state agency, Oregon Department of Transportation | ACEC-ODOT Partnership regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid Pricing Form, Bid Cover Sheet, References, W-9 Form, Responsibility Inquiry Form, Certification Regarding Debarment. Review the full document from Oregon Department of Transportation | ACEC-ODOT Partnership for the complete list.