BIDCLOSED
Save

Illinois Secretary of State - Re-Bid New Boiler at Chicago West Facility - IFB 26-350SOS-SOS35-B-52358 - 2026

Illinois Office of the Secretary of State | State of Illinois logoIllinois Office of the Secretary of State | State of Illinois
Due
May 28, 2026
Deadline passed
Posted
May 6, 2026
Contract term
4 years
Primary contact
Katie Speck
(217) 558-3744

The 30-second brief

What they're buying

The Illinois Secretary of State is seeking competitive bids for the installation of a new boiler at the Chicago West facility located at 5301 W. Lexington St., Chicago, IL 60644 (Solicitation No. 26-350SOS-SOS35-B-52358). The project encompasses the removal and replacement of an existing water tube boiler with two condensing boilers of the same capacity, primary pump installation, electrical work including circuit breakers, ductwork, piping, controls, instrumentation, and concrete housekeeping pad modifications. A mandatory pre-bid conference is scheduled for May 15, 2026, at 10:00 AM at the Chicago West facility basement conference room. Bids are due by May 28, 2026, at 2:00 PM and must be submitted electronically via the BidBuy portal. Vendors are required to comply with prevailing wage laws and provide bid security.

What you must deliver

Installation of New Boiler at Chicago West facility; removal and replacement of existing water tube boiler with two condensing boilers; primary pump, Controls, And instrumentation; electrical circuit breakers; piping, Conduits, And ductwork modifications; housekeeping pad expansion.

How it's scored

Lowest responsible and responsive bidder

Hear what Illinois Office of the Secretary of State | State of Illinois plans next before it's posted.

Get alerts free

Free account · 30-second setup · No credit card

Summary

The Illinois Secretary of State is seeking competitive bids for the installation of a new boiler at the Chicago West facility located at 5301 W. Lexington St., Chicago, IL 60644 (Solicitation No. 26-350SOS-SOS35-B-52358).

The project encompasses the removal and replacement of an existing water tube boiler with two condensing boilers of the same capacity, primary pump installation, electrical work including circuit breakers, ductwork, piping, controls, instrumentation, and concrete housekeeping pad modifications. A mandatory pre-bid conference is scheduled for May 15, 2026, at 10:00 AM at the Chicago West facility basement conference room. Bids are due by May 28, 2026, at 2:00 PM and must be submitted electronically via the BidBuy portal. Vendors are required to comply with prevailing wage laws and provide bid security.

EVALUATION CRITERIA

Lowest responsible and responsive bidder

REQUIRED DELIVERABLES

6
  • Installation of New Boiler at Chicago West facility
  • Removal and replacement of existing water tube boiler with two condensing boilers
  • Primary pump, Controls, And instrumentation
  • Electrical circuit breakers
  • Piping, Conduits, And ductwork modifications
  • Housekeeping pad expansion

REQUIRED ATTACHMENTS

5
  • Bid Bond 10%
  • Performance Bond
  • Vendor Disclosure or IPG Active Registered Vendor Disclosure
  • CDB Qualification Certificate
  • Signed addenda
Submit to
https://www.bidbuy.illinois.gov
Duration
48 months
Scope location
Chicago, IL
Reported agency
Illinois Secretary of State

Questions about this BID

How do I respond to this Bid from Illinois Office of the Secretary of State | State of Illinois?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is May 28, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: https://www.bidbuy.illinois.gov. For questions, contact Katie Speck.

Can small businesses or minority-owned firms bid on this Bid?

Most government agencies, including Illinois Office of the Secretary of State | State of Illinois in IL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the Bid submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

Can I ask questions about this solicitation before submitting?

Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Katie Speck at (217) 558-3744. Questions and answers are typically shared with all prospective bidders.

What are the key deliverables?

The solicitation specifies the following deliverables: Installation of New Boiler at Chicago West facility; removal and replacement of existing water tube boiler with two condensing boilers; primary pump, Controls, And instrumentation; electrical circuit breakers; piping, Conduits, And ductwork modifications; housekeeping pad expansion.. Proposals should clearly address how each deliverable will be met.

Show 5 more questions

What are the evaluation criteria for this solicitation?

This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Lowest responsible and responsive bidder" Vendors should carefully align their proposals with each criterion to maximize their score.

Where can I find more RFPs from Illinois Office of the Secretary of State | State of Illinois?

All active and historical solicitations from Illinois Office of the Secretary of State | State of Illinois are tracked and searchable. As a state agency, Illinois Office of the Secretary of State | State of Illinois regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What is the contract term for this solicitation?

The anticipated contract term is 4 years. Contract terms may include renewal options.

What documents are required to bid on this Bid?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid Bond 10%, Performance Bond, Vendor Disclosure or IPG Active Registered Vendor Disclosure, CDB Qualification Certificate, signed addenda. Review the full document from Illinois Office of the Secretary of State | State of Illinois for the complete list.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: Chicago, IL. Review the full solicitation for detailed scope requirements.

Work in government? Get Civic IQ free →

Start finding government buyers today.
It's free.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Get started free

No credit card required