Erie International Airport Extend Taxiway A and Realign Taxiways D/G/F Bid Package 1 2026
Erie Municipal Airport AuthorityAirport Authority · Erie, PA- Due
- May 1, 2026
- Deadline passed
- Posted
- May 1, 2026
- Primary contact
- Byron Henicle
- (971) 256-9307
The 30-second brief
Erie International Airport (ERI) is soliciting bids for Bid Package 1 of a project to extend Taxiway A and realign Taxiways D/G/F. The scope of work includes the first phase of realigning Taxiway D between Taxiway C and Runway 2-20, construction of Taxiway A5, and demolition of portions of existing Taxiway D. Specific tasks involve sawcutting, pavement removal, base course installation, paving, topsoil grading, seeding, mulching, pavement marking, taxiway edge lighting, and taxiway guidance sign modifications. The project requires strict adherence to the Construction Safety Phasing Plan (CSPP) and the submission of a Safety Plan Compliance Document (SPCD) by the contractor. Construction is anticipated for the spring/summer 2027 season. A pre-bid conference will be conducted to clarify construction methods and safety requirements.
Safety Plan Compliance Document (SPCD), Staging area layout plan, Temporary jumper plan, Field acknowledgement form for utilities
Compliance with FAR Part 139, FAA Advisory Circular 150/5370-2G, and project specifications
Hear what Erie Municipal Airport Authority plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Erie International Airport (ERI) is soliciting bids for Bid Package 1 of a project to extend Taxiway A and realign Taxiways D/G/F. The scope of work includes the first phase of realigning Taxiway D between Taxiway C and Runway 2-20, construction of Taxiway A5, and demolition of portions of existing Taxiway D. Specific tasks involve sawcutting, pavement removal, base course installation, paving, topsoil grading, seeding, mulching, pavement marking, taxiway edge lighting, and taxiway guidance sign modifications.
The project requires strict adherence to the Construction Safety Phasing Plan (CSPP) and the submission of a Safety Plan Compliance Document (SPCD) by the contractor. Construction is anticipated for the spring/summer 2027 season. A pre-bid conference will be conducted to clarify construction methods and safety requirements.
EVALUATION CRITERIA
3- Compliance with FAR Part 139
- FAA Advisory Circular 150/5370-2G
- Project specifications
REQUIRED DELIVERABLES
4- Safety Plan Compliance Document (SPCD)
- Staging area layout plan
- Temporary jumper plan
- Field acknowledgement form for utilities
REQUIRED ATTACHMENTS
Appendix A Construction Safety Phasing Plan Drawings
- Scope location
- Erie, PA
- Reported agency
- Erie International Airport
Questions about this BID
How do I respond to this Bid from Erie Municipal Airport Authority?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is May 1, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. For questions, contact Byron Henicle.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Erie Municipal Airport Authority in PA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Byron Henicle at (971) 256-9307. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Safety Plan Compliance Document (SPCD), Staging area layout plan, Temporary jumper plan, Field acknowledgement form for utilities. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Compliance with FAR Part 139, FAA Advisory Circular 150/5370-2G, and project specifications" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Erie Municipal Airport Authority?
All active and historical solicitations from Erie Municipal Airport Authority are tracked and searchable. As a airport authority agency, Erie Municipal Airport Authority regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Appendix A Construction Safety Phasing Plan Drawings. Review the full document from Erie Municipal Airport Authority for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Erie, PA. Review the full solicitation for detailed scope requirements.