University of Florida - Replacement of the Rabon Plant Cooling Towers 4 and 5 - FY27-ITN-001 (2026)
- Due
- Aug 20, 2026
- Deadline passed
- Posted
- Jul 9, 2026
- Primary contact
- Mike Loudis
- (352) 294-1154
The 30-second brief
University of Florida is seeking competitive proposals for the disposal and replacement of Cooling Towers 4 and 5 at the Lacy C. Rabon Chilled Water Plant, located at 1858 Mowry Rd, Building 0473, Gainesville, FL 32608. The project involves replacing the structure of the 2-cell Marley cooling towers utilizing the existing 40ft x 50ft basin footprint, including mechanical piping, fans, gearboxes with metal blades, fill, drift eliminators, vibration switches, and lube oil systems. The budget for this project is $950,000.00, with a strict completion deadline no later than April 1, 2027. A mandatory pre-bid site visit is scheduled for July 17, 2026, at 9:30 am, and proposals are due by August 20, 2026.
Technical proposal including ability to complete work no later than April 1, 2027, Pricing Proposal, Evidence of satisfactory performance on five similar projects within the past five years, References (trade, bank, surety), Professional services offered and support options, Agreement with UF standard Terms & Conditions and technical specifications, Material and workmanship warranty
Hear what University Of Florida plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
University of Florida is seeking competitive proposals for the disposal and replacement of Cooling Towers 4 and 5 at the Lacy C. Rabon Chilled Water Plant, located at 1858 Mowry Rd, Building 0473, Gainesville, FL 32608.
The project involves replacing the structure of the 2-cell Marley cooling towers utilizing the existing 40ft x 50ft basin footprint, including mechanical piping, fans, gearboxes with metal blades, fill, drift eliminators, vibration switches, and lube oil systems. The budget for this project is $950,000.00, with a strict completion deadline no later than April 1, 2027. A mandatory pre-bid site visit is scheduled for July 17, 2026, at 9:30 am, and proposals are due by August 20, 2026.
EVALUATION CRITERIA
Technical proposal including ability to complete work no later than April 1, 2027, Pricing Proposal, Evidence of satisfactory performance on five similar projects within the past five years, References (trade, bank, surety), Professional services offered and support options, Agreement with UF standard Terms & Conditions and technical specifications, Material and workmanship warranty
REQUIRED ATTACHMENTS
10- Certification of Proposal
- Proof of corporation
- Proof of liability insurance coverage
- Engineered drawings
- Safety information and EMR rating
- Minimum material and workmanship warranty
- List of subcontractors
- Trade references
- Bank references
- Surety references and bonding letters
- Submit to
- https://app01.jaggaer.com/apps/Router/ViewSourcingEvent?AuthToken=1%3AAES2%23CJtljX%2B%2Fsxcue1Hc9y8sZ61CpqSBpTA2tX3FA8V
- Scope location
- Gainesville, FL
- Reported agency
- University of Florida
Questions about this ITB
How do I respond to this ITB from University Of Florida?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is August 20, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: https://app01.jaggaer.com/apps/Router/ViewSourcingEvent?AuthToken=1%3AAES2%23CJtljX%2B%2Fsxcue1Hc9y8sZ61CpqSBpTA2tX3FA8V. For questions, contact Mike Loudis.
Can small businesses or minority-owned firms bid on this ITB?
Most government agencies, including University Of Florida in FL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the ITB submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Mike Loudis at (352) 294-1154. Questions and answers are typically shared with all prospective bidders.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Technical proposal including ability to complete work no later than April 1, 2027, Pricing Proposal, Evidence of satisfactory performance on five similar projects within the past five years, Reference..." Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from University Of Florida?
All active and historical solicitations from University Of Florida are tracked and searchable. As a higher ed agency, University Of Florida regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this ITB?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Certification of Proposal, proof of corporation, proof of liability insurance coverage, engineered drawings, safety information and EMR rating, minimum material and workmanship warranty, list of subco. Review the full document from University Of Florida for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Gainesville, FL. Review the full solicitation for detailed scope requirements.