Trident Technical College Furnish and Install Electrical for Printer B950 Quote 01413 (2026)
- Due
- Nov 18, 2026
- 3 days left
- Posted
- Nov 10, 2026
- Primary contact
- Carlene Peters
- (843) 574-6279
The 30-second brief
Trident Technical College is requesting written quotes for electrical infrastructure services to support the relocation and operation of commercial printing equipment in Building 950 at the Thornley Campus in North Charleston, SC. The scope includes electrical panel modifications, dedicated circuit installation, EMT conduit and wiring, receptacles and equipment connections, testing, and commissioning. Contractors must furnish and install 12 dedicated electrical circuits, ten 120V duplex receptacles, two dedicated 208V 30A NEMA L6-30R twist-lock receptacles, 500 linear feet of 1-inch EMT conduit, and copper conductors. The submission deadline is November 18, 2026, at 10:00 AM EST, via email to Carlene Peters.
Twelve (12) fully operational dedicated electrical circuits serving relocated print shop equipment; Ten (10) dedicated 120V duplex receptacles; Two (2) dedicated 208V, 30A NEMA L6-30R receptacles; Completed testing and verification of all installed electrical systems; Final cleanup of all work areas
Unit prices
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Trident Technical College is requesting written quotes for electrical infrastructure services to support the relocation and operation of commercial printing equipment in Building 950 at the Thornley Campus in North Charleston, SC. The scope includes electrical panel modifications, dedicated circuit installation, EMT conduit and wiring, receptacles and equipment connections, testing, and commissioning.
Contractors must furnish and install 12 dedicated electrical circuits, ten 120V duplex receptacles, two dedicated 208V 30A NEMA L6-30R twist-lock receptacles, 500 linear feet of 1-inch EMT conduit, and copper conductors. The submission deadline is November 18, 2026, at 10:00 AM EST, via email to Carlene Peters.
EVALUATION CRITERIA
Unit prices
REQUIRED DELIVERABLES
5- Twelve (12) fully operational dedicated electrical circuits serving relocated print shop equipment
- Ten (10) dedicated 120V duplex receptacles
- Two (2) dedicated 208V, 30A NEMA L6-30R receptacles
- Completed testing and verification of all installed electrical systems
- Final cleanup of all work areas
REQUIRED ATTACHMENTS
signed copy of this form
- Submit to
- [email protected]
- Scope location
- North Charleston, SC
Questions about this QUOTE
How do I respond to this Quote from Trident Technical College?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 18, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: [email protected]. For questions, contact Carlene Peters.
Can small businesses or minority-owned firms bid on this Quote?
Most government agencies, including Trident Technical College in SC, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Quote submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Carlene Peters at (843) 574-6279. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Twelve (12) fully operational dedicated electrical circuits serving relocated print shop equipment; Ten (10) dedicated 120V duplex receptacles; Two (2) dedicated 208V, 30A NEMA L6-30R receptacles; Completed testing and verification of all installed electrical systems; Final cleanup of all work areas. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Unit prices" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Trident Technical College?
All active and historical solicitations from Trident Technical College are tracked and searchable. As a higher ed agency, Trident Technical College regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of November 18, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Quote?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: signed copy of this form. Review the full document from Trident Technical College for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: North Charleston, SC. Review the full solicitation for detailed scope requirements.