Town of Superior Alley and Roadway Treatment Project Bid PW 2026-03
- Due
- Apr 1, 2026
- Deadline passed
- Posted
- Mar 9, 2026
- Primary contact
- Brannon Richards
The 30-second brief
The Town of Superior is requesting bids for the Alley and Roadway Treatment Project (Work No. PW 2026-03). The scope includes stabilization of milled alleys and 5th Avenue in Original Town Superior, featuring leveling and compacting existing surfaces, placing and compacting 3-inch crushed and screened millings, applying stabilization treatment (Earthbind Stabilizer or approved equal), and final compaction with a wet roller. A mandatory pre-bid meeting and site tour is scheduled for March 16, 2026. Bids are due by April 1, 2026, at 2:00 P.M. The project requires 80% Colorado labor compliance per the Keep Jobs In Colorado Act for contracts over $500,000. No bid bond is required, but payment and performance bonds are mandatory upon contract award.
Bid Form, Bid Summary, Bid Schedule, Bidder’s Qualification Statement, Staff resumes, Proposed scope and schedule, Subcontractor list, Previous experience list, Statement of manufacturer warranty
Lowest responsible and responsive bidder, quality of product, past experience, qualifications, services offered, warranties, maintenance considerations, long-range costs, delivery
Get notified when Superior posts the next one.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Town of Superior is requesting bids for the Alley and Roadway Treatment Project (Work No.
PW 2026-03). The scope includes stabilization of milled alleys and 5th Avenue in Original Town Superior, featuring leveling and compacting existing surfaces, placing and compacting 3-inch crushed and screened millings, applying stabilization treatment (Earthbind Stabilizer or approved equal), and final compaction with a wet roller. A mandatory pre-bid meeting and site tour is scheduled for March 16, 2026. Bids are due by April 1, 2026, at 2:00 P.M. The project requires 80% Colorado labor compliance per the Keep Jobs In Colorado Act for contracts over $500,000. No bid bond is required, but payment and performance bonds are mandatory upon contract award.
EVALUATION CRITERIA
9- Lowest responsible and responsive bidder
- Quality of product
- Past experience
- Qualifications
- Services offered
- Warranties
- Maintenance considerations
- Long-range costs
- Delivery
REQUIRED DELIVERABLES
9- Bid Form
- Bid Summary
- Bid Schedule
- Bidder’s Qualification Statement
- Staff resumes
- Proposed scope and schedule
- Subcontractor list
- Previous experience list
- Statement of manufacturer warranty
REQUIRED ATTACHMENTS
9- Bid Form
- Bid Schedule
- Bidder’s Qualification Statement
- Construction Contract
- Payment and Performance Bond
- General Provisions
- Special Provisions
- Technical Specifications
- Construction Drawings
- Submit to
- 124 E. Coal Creek Drive, Superior, CO 80027
- Scope location
- Superior, CO
Questions about this BID
How do I respond to this Bid from Town of Superior?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is April 1, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: 124 E. Coal Creek Drive, Superior, CO 80027. For questions, contact Brannon Richards.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Town of Superior in CO, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Brannon Richards. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Bid Form, Bid Summary, Bid Schedule, Bidder’s Qualification Statement, Staff resumes, Proposed scope and schedule, Subcontractor list, Previous experience list, Statement of manufacturer warranty. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Lowest responsible and responsive bidder, quality of product, past experience, qualifications, services offered, warranties, maintenance considerations, long-range costs, delivery" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Town of Superior?
All active and historical solicitations from Town of Superior are tracked and searchable. As a city agency, Town of Superior regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid Form, Bid Schedule, Bidder’s Qualification Statement, Construction Contract, Payment and Performance Bond, General Provisions, Special Provisions, Technical Specifications, Construction Drawings. Review the full document from Town of Superior for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Superior, CO. Review the full solicitation for detailed scope requirements.