Town of Spurgeon Water Storage Tank Rehabilitation - W26007 (2026)
Town of SpurgeonCity · Spurgeon, IN- Due
- Oct 1, 2026
- Deadline passed
- Primary contact
- John Wetzel
- (812) 721-2043
The 30-second brief
The Town of Spurgeon, Indiana is seeking bids for water storage tank rehabilitation under project W26007. The project includes removal of the existing storage tank paint coating system and application of a new system, site grading, electrical grounding, repairs to the tank foundation, replacement of the manway riser, foundation anchor nuts, tower and bowl access ladders, interior bowl and riser ladders, adjustment of riser stay and windage rods, replacement of the overflow pipe, installation of a concrete splash pad, roof tie-off points, roof vent with frost proof vent, weeper holes in the balcony floor, and a tank mixer. Submissions are due by October 1, 2026, at 6:00 PM.
Removal of existing storage tank paint coating system, Application of new storage tank paint coating system, Site grading, Electrically grounding of water storage tank, Repairs to tank foundation, Replacement of manway riser, Replacement of foundation anchor nuts, Removal and replacement of tower access ladder, Removal and replacement of bowl access ladder, Installation of interior bowl access ladder, Removal of interior riser ladder, Adjustment of riser stay and windage rods, Replacement of existing overflow pipe, Installation of concrete splash pad, Installation of roof tie-off points, Removal and replacement of roof vent w/ frost proof vent, Installation of weeper holes in balcony floor, Installation of tank mixer
Hear what Spurgeon plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Town of Spurgeon, Indiana is seeking bids for water storage tank rehabilitation under project W26007.
The project includes removal of the existing storage tank paint coating system and application of a new system, site grading, electrical grounding, repairs to the tank foundation, replacement of the manway riser, foundation anchor nuts, tower and bowl access ladders, interior bowl and riser ladders, adjustment of riser stay and windage rods, replacement of the overflow pipe, installation of a concrete splash pad, roof tie-off points, roof vent with frost proof vent, weeper holes in the balcony floor, and a tank mixer. Submissions are due by October 1, 2026, at 6:00 PM.
REQUIRED DELIVERABLES
18- Removal of existing storage tank paint coating system
- Application of new storage tank paint coating system
- Site grading
- Electrically grounding of water storage tank
- Repairs to tank foundation
- Replacement of manway riser
- Replacement of foundation anchor nuts
- Removal and replacement of tower access ladder
- Removal and replacement of bowl access ladder
- Installation of interior bowl access ladder
- Removal of interior riser ladder
- Adjustment of riser stay and windage rods
- Replacement of existing overflow pipe
- Installation of concrete splash pad
- Installation of roof tie-off points
- Removal and replacement of roof vent w/ frost proof vent
- Installation of weeper holes in balcony floor
- Installation of tank mixer
- Submit to
- PO Box 676 11440 S State Road 61, Spurgeon, IN, 47584
- Scope location
- Pike, IN
Questions about this BID
How do I respond to this Bid from Town of Spurgeon?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is October 1, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: PO Box 676 11440 S State Road 61, Spurgeon, IN, 47584. For questions, contact John Wetzel.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Town of Spurgeon in IN, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is John Wetzel at (812) 721-2043. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Removal of existing storage tank paint coating system, Application of new storage tank paint coating system, Site grading, Electrically grounding of water storage tank, Repairs to tank foundation, Replacement of manway riser, Replacement of foundation anchor nuts, Removal and replacement of tower ac. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from Town of Spurgeon?
All active and historical solicitations from Town of Spurgeon are tracked and searchable. As a city agency, Town of Spurgeon regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Town of Spurgeon for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Pike, IN. Review the full solicitation for detailed scope requirements.