Town of Colchester Norton Park Phase 1 Construction Plans - Job # 24-028
- Posted
- Aug 6, 2024
The 30-second brief
The Town of Colchester is soliciting bids for the construction of Norton Park Phase 1 located at #139 Westchester Road. The project scope includes earthwork (1,100 CY cut, 1,000 CY fill), installation of a 780 SF boulder retaining wall, 700 SF brick patio, granite benches, and a 6,450 SF gravel road and parking area. Additional work involves 4-foot wide grassed and gravel walking paths, split rail fencing, pre-cast concrete stairs, curb stops, and extensive erosion and sediment control measures including silt fencing and slope protection. The site is situated along the Jeremy River and Westchester Road (RT 149). Contractors are required to preserve and protect all existing utilities and coordinate with 'Call Before You Dig'. The plans were prepared by Reynolds Engineering Services, LLC and Rob Hellstrom Land Surveying LLC.
Construction services, Earthwork, Retaining walls, Paving, Landscaping
Hear what Colchester plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Town of Colchester is soliciting bids for the construction of Norton Park Phase 1 located at #139 Westchester Road.
The project scope includes earthwork (1,100 CY cut, 1,000 CY fill), installation of a 780 SF boulder retaining wall, 700 SF brick patio, granite benches, and a 6,450 SF gravel road and parking area. Additional work involves 4-foot wide grassed and gravel walking paths, split rail fencing, pre-cast concrete stairs, curb stops, and extensive erosion and sediment control measures including silt fencing and slope protection. The site is situated along the Jeremy River and Westchester Road (RT 149). Contractors are required to preserve and protect all existing utilities and coordinate with 'Call Before You Dig'. The plans were prepared by Reynolds Engineering Services, LLC and Rob Hellstrom Land Surveying LLC.
REQUIRED DELIVERABLES
5- Construction services
- Earthwork
- Retaining walls
- Paving
- Landscaping
REQUIRED ATTACHMENTS
3- Erosion & Sediment Control Plan
- Site Plan
- Construction Details
- Scope location
- Colchester, CT
Questions about this BID
How do I respond to this Bid from Town of Colchester?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Town of Colchester in CT, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: Construction services, Earthwork, Retaining walls, Paving, Landscaping. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from Town of Colchester?
All active and historical solicitations from Town of Colchester are tracked and searchable. As a city agency, Town of Colchester regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Erosion & Sediment Control Plan, Site Plan, Construction Details. Review the full document from Town of Colchester for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Colchester, CT. Review the full solicitation for detailed scope requirements.