QUOTECLOSED
Save

Sunrise Water Authority Hazmat Spill Response Trailer and Equipment RFQ S-R03005-00016818 2026

Sunrise Water Authority
Due
May 15, 2026
Deadline passed
Primary contact
Colin Brownsberger
(503) 908-2719

The 30-second brief

What they're buying

Sunrise Water Authority, in cooperation with the North Clackamas County Water Commission (NCCWC) and Clackamas River Water Providers (CRWP), is soliciting quotes for a fully equipped, towable hazmat spill response trailer. The procurement includes a 12 ft x 6 ft trailer with a minimum 1,500 lbs payload capacity and a suite of spill response equipment such as containment booms (deflection and exclusion), anchoring systems, ropes, personal protective equipment (PPE), sorbent materials, and storage systems. The equipment must align with the CRWP Geographic Response Plan (GRP) to protect drinking water intakes along the Clackamas River. All equipment must be new; no used or refurbished items will be considered. Electronic quotes are due by May 15, 2026, at 2:00 PM Pacific Time. Preference is given to vendors providing a complete package and those designated as disadvantaged business enterprises (DBE).

What you must deliver

Trailer specifications, Detailed equipment list, Customization details, Itemized quote, Delivery timeline, Warranty information, Vendor experience

How it's scored

Completeness, price, inventory of items offered, product warranties, DBE status

Hear what Sunrise Water Authority plans next before it's posted.

Get alerts free

Free account · 30-second setup · No credit card

Summary

Sunrise Water Authority, in cooperation with the North Clackamas County Water Commission (NCCWC) and Clackamas River Water Providers (CRWP), is soliciting quotes for a fully equipped, towable hazmat spill response trailer.

The procurement includes a 12 ft x 6 ft trailer with a minimum 1,500 lbs payload capacity and a suite of spill response equipment such as containment booms (deflection and exclusion), anchoring systems, ropes, personal protective equipment (PPE), sorbent materials, and storage systems. The equipment must align with the CRWP Geographic Response Plan (GRP) to protect drinking water intakes along the Clackamas River. All equipment must be new; no used or refurbished items will be considered. Electronic quotes are due by May 15, 2026, at 2:00 PM Pacific Time. Preference is given to vendors providing a complete package and those designated as disadvantaged business enterprises (DBE).

EVALUATION CRITERIA

5
  • Completeness
  • Price
  • Inventory of items offered
  • Product warranties
  • DBE status

REQUIRED DELIVERABLES

7
  • Trailer specifications
  • Detailed equipment list
  • Customization details
  • Itemized quote
  • Delivery timeline
  • Warranty information
  • Vendor experience
Scope location
Happy Valley, OR

Questions about this QUOTE

How do I respond to this Quote from Sunrise Water Authority?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is May 15, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: [email protected]. For questions, contact Colin Brownsberger.

Can small businesses or minority-owned firms bid on this Quote?

Most government agencies, including Sunrise Water Authority in OR, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the Quote submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

Can I ask questions about this solicitation before submitting?

Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Colin Brownsberger at (503) 908-2719. Questions and answers are typically shared with all prospective bidders.

What are the key deliverables?

The solicitation specifies the following deliverables: Trailer specifications, Detailed equipment list, Customization details, Itemized quote, Delivery timeline, Warranty information, Vendor experience. Proposals should clearly address how each deliverable will be met.

Show 4 more questions

What are the evaluation criteria for this solicitation?

This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Completeness, price, inventory of items offered, product warranties, DBE status" Vendors should carefully align their proposals with each criterion to maximize their score.

Where can I find more RFPs from Sunrise Water Authority?

All active and historical solicitations from Sunrise Water Authority are tracked and searchable. As a utility district agency, Sunrise Water Authority regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What documents are required to bid on this Quote?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Sunrise Water Authority for the complete list.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: Happy Valley, OR. Review the full solicitation for detailed scope requirements.

Work in government? Get Civic IQ free →

Start finding government buyers today.
It's free.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Get started free

No credit card required