San Antonio Water System - Central Sewershed Package 10 - RFCSP CO-00920-RL (2026)
- Due
- Oct 21, 2026
- Deadline passed
- Posted
- Sep 11, 2026
- Primary contact
- Roxanne Lockhart
- (210) 233-3095
The 30-second brief
Sealed proposals are requested by the San Antonio Water System (SAWS) for the construction of approximately 560-linear feet of 8-inch Sewer Main and 97-linear feet of 6-inch Sewer Main via cured-in-place pipe (CIPP), point repairs, and 390-linear feet of 8-inch Sewer Main via open cut for the Central Sewershed Package 10 (Terrell Hills), SAWS Job No. 20-4505. The estimated budget is $2,100,000.00. Proposals will be received electronically only until 2:00 PM CDT on October 21, 2026 via the secure SAWS Secure Share site, and must be accompanied by a bid bond of not less than five percent of the total proposal price. A non-mandatory pre-proposal meeting will be held on September 11, 2026, at SAWS Headquarters. Technical questions must be submitted in writing to Roxanne Lockhart by September 18, 2026.
560-linear feet of 8-inch Sewer Main via cured-in-place pipe (CIPP), 97-linear feet of 6-inch Sewer Main via CIPP, Point repairs, 390-linear feet of 8-inch Sewer Main via open cut
Hear what San Antonio Water System (SAWS) plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Sealed proposals are requested by the San Antonio Water System (SAWS) for the construction of approximately 560-linear feet of 8-inch Sewer Main and 97-linear feet of 6-inch Sewer Main via cured-in-place pipe (CIPP), point repairs, and 390-linear feet of 8-inch Sewer Main via open cut for the Central Sewershed Package 10 (Terrell Hills), SAWS Job No. 20-4505.
The estimated budget is $2,100,000.00. Proposals will be received electronically only until 2:00 PM CDT on October 21, 2026 via the secure SAWS Secure Share site, and must be accompanied by a bid bond of not less than five percent of the total proposal price. A non-mandatory pre-proposal meeting will be held on September 11, 2026, at SAWS Headquarters. Technical questions must be submitted in writing to Roxanne Lockhart by September 18, 2026.
REQUIRED DELIVERABLES
560-linear feet of 8-inch Sewer Main via cured-in-place pipe (CIPP), 97-linear feet of 6-inch Sewer Main via CIPP, Point repairs, 390-linear feet of 8-inch Sewer Main via open cut
REQUIRED ATTACHMENTS
bid bond
- Submit to
- https://apps.saws.org/Business_Center/Contractsol/drill.cfm?id=4594&View=Yes
- Scope location
- San Antonio, Texas
- Reported agency
- San Antonio Water System
Questions about this RFP
How do I respond to this RFP from San Antonio Water System (SAWS)?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is October 21, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: https://apps.saws.org/Business_Center/Contractsol/drill.cfm?id=4594&View=Yes. For questions, contact Roxanne Lockhart.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including San Antonio Water System (SAWS) in TX, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Roxanne Lockhart at (210) 233-3095. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: 560-linear feet of 8-inch Sewer Main via cured-in-place pipe (CIPP), 97-linear feet of 6-inch Sewer Main via CIPP, Point repairs, 390-linear feet of 8-inch Sewer Main via open cut. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from San Antonio Water System (SAWS)?
All active and historical solicitations from San Antonio Water System (SAWS) are tracked and searchable. As a utility district agency, San Antonio Water System (SAWS) regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: bid bond. Review the full document from San Antonio Water System (SAWS) for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: San Antonio, Texas. Review the full solicitation for detailed scope requirements.