Massachusetts Department of Transportation - BEVERLY Bridge Replacement, B-11-001 Bridge Street over Bass River (Hall-Whitaker Bridge) Design-Build Project No. 605276, 2026
- Due
- Sep 1, 2026
- Deadline passed
- Posted
- Jun 1, 2026
- Contract term
- 3 years
- Primary contact
- Eric M. Cardone
- (857) 368-9524
The 30-second brief
The Massachusetts Department of Transportation (MassDOT) is issuing a Request for Qualifications (RFQ) for the design and construction of the Beverly Bridge Replacement (Hall-Whitaker Bridge) over the Bass River, designated as Design-Build Project No. 605276 with an estimated cost of $108,760,000. The project involves replacing the existing closed movable bridge with a new three-span fixed-span permanent bridge, full-depth highway and bridge approach reconstruction along Bridge Street and Margin Street, retaining walls, utility relocations, stormwater management upgrades, environmental permitting, hazardous materials management, and temporary traffic control. Statements of Qualifications (SOQ) are due by September 1, 2026, at 12:00 PM, following a two-phase Best Value Design-Build procurement process. Proposers must meet MassDOT A&E Board and Construction Contractor prequalification requirements, including a Single Contract Limit of at least $108,760,000 in Bridge Construction, and provide 100% bonding capacity.
Design and construction of a new fixed-span permanent Hall-Whitaker Bridge, Approach roadways, Retaining walls, Utility relocation, Stormwater drainage system improvements, Wetland restoration, And demolition of temporary bridge structure.
Similar type work experience for Bridge and Highway reconstruction including over tidal and navigable waters, Joint experience of the DB team members, Design-Build experience, Quality of performance on prior projects, Experience of Key Personnel, Experience in managing accelerated work schedules, Financial Status, Litigation and Performance/Termination History, Safety Record, Reference Information, Volume of current work on MassDOT projects, Successful implementation of complex Traffic Management Plans and RTTM
Hear what Massachusetts Department of Transportation | Commonwealth of Massachusetts plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Massachusetts Department of Transportation (MassDOT) is issuing a Request for Qualifications (RFQ) for the design and construction of the Beverly Bridge Replacement (Hall-Whitaker Bridge) over the Bass River, designated as Design-Build Project No. 605276 with an estimated cost of $108,760,000.
The project involves replacing the existing closed movable bridge with a new three-span fixed-span permanent bridge, full-depth highway and bridge approach reconstruction along Bridge Street and Margin Street, retaining walls, utility relocations, stormwater management upgrades, environmental permitting, hazardous materials management, and temporary traffic control. Statements of Qualifications (SOQ) are due by September 1, 2026, at 12:00 PM, following a two-phase Best Value Design-Build procurement process. Proposers must meet MassDOT A&E Board and Construction Contractor prequalification requirements, including a Single Contract Limit of at least $108,760,000 in Bridge Construction, and provide 100% bonding capacity.
EVALUATION CRITERIA
Similar type work experience for Bridge and Highway reconstruction including over tidal and navigable waters, Joint experience of the DB team members, Design-Build experience, Quality of performance on prior projects, Experience of Key Personnel, Experience in managing accelerated work schedules, Financial Status, Litigation and Performance/Termination History, Safety Record, Reference Information, Volume of current work on MassDOT projects, Successful implementation of complex Traffic Management Plans and RTTM
REQUIRED DELIVERABLES
7- Design and construction of a new fixed-span permanent Hall-Whitaker Bridge
- Approach roadways
- Retaining walls
- Utility relocation
- Stormwater drainage system improvements
- Wetland restoration
- Demolition of temporary bridge structure
REQUIRED ATTACHMENTS
11- Statement of Qualifications Submission Checklist
- Design-Build Statement of Qualifications Transmittal Form
- Schedule A Terminations and Legal Proceedings
- Schedule B Safety Record
- Schedule C Letter Evidencing Bonding Capacity
- Schedule D Certification Regarding Debarment
- Suspension
- Proposed Debarment
- Other Responsibility Matters
- Affirmative Action Certificate or Plan
- Conflict of Interest Disclosure Form Appendix D
REQUIRED STAFFING
11- Submit to
- [email protected]
- Duration
- 1200 months
- Scope location
- Beverly, MA
- Reported agency
- Massachusetts Department of Transportation
Questions about this RFQ
How do I respond to this RFQ from Massachusetts Department of Transportation | Commonwealth of Massachusetts?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 1, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: [email protected]. For questions, contact Eric M. Cardone.
Can small businesses or minority-owned firms bid on this RFQ?
Most government agencies, including Massachusetts Department of Transportation | Commonwealth of Massachusetts in MA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFQ submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Eric M. Cardone at (857) 368-9524. Questions and answers are typically shared with all prospective bidders.
What staffing is required for this project?
This solicitation outlines specific staffing requirements. The required roles include: Project Manager, Quality Control Administrator, Design Quality Control Manager, Design Manager, Lead Highway Engineer, Lead Structural Engineer, Construction Manager, Construction Quality Control Manager, Construction Superintendent, Site Safety Officer, Environmental Compliance Manager. Proposers should demonstrate relevant qualifications and experience for each required role.
What are the key deliverables?
The solicitation specifies the following deliverables: Design and construction of a new fixed-span permanent Hall-Whitaker Bridge, Approach roadways, Retaining walls, Utility relocation, Stormwater drainage system improvements, Wetland restoration, And demolition of temporary bridge structure.. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Similar type work experience for Bridge and Highway reconstruction including over tidal and navigable waters, Joint experience of the DB team members, Design-Build experience, Quality of performance o..." Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Massachusetts Department of Transportation | Commonwealth of Massachusetts?
All active and historical solicitations from Massachusetts Department of Transportation | Commonwealth of Massachusetts are tracked and searchable. As a state agency, Massachusetts Department of Transportation | Commonwealth of Massachusetts regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 3 years. Contract terms may include renewal options.
What documents are required to bid on this RFQ?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Statement of Qualifications Submission Checklist, Design-Build Statement of Qualifications Transmittal Form, Schedule A Terminations and Legal Proceedings, Schedule B Safety Record, Schedule C Letter. Additionally, proposals should address staffing requirements as outlined in the solicitation. Review the full document from Massachusetts Department of Transportation | Commonwealth of Massachusetts for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Beverly, MA. Review the full solicitation for detailed scope requirements.