BIDCLOSED
Save

Lowell Joint School District Olita Elementary School Modular Classroom Building Bid - A# 03-125787 - 2026

Lowell Joint logoLowell Joint
Due
Apr 30, 2026
Deadline passed
Posted
Apr 1, 2026

The 30-second brief

What they're buying

Lowell Joint School District is soliciting bids for the construction of a new Modular Classroom Building at Olita Elementary School, located at 950 Briercliff Dr., La Habra, CA 90631. The project, identified by Application No. 03-125787 and File No. 19-65, encompasses a comprehensive scope including site clearing, earthwork, concrete paving, structural steel, cold-formed metal framing, and electrical systems (including EV chargers and photovoltaic power). The work also involves communications systems, fire alarms, and exterior improvements such as chain link fencing and irrigation. The project manual specifies administrative requirements for submittals, testing and inspection (DSA 103), and storm water pollution prevention. Bidders must coordinate with Ghataode Bannon Architects, LLP and RTM Engineering Consultants. The document establishes a 75% salvage/recycling rate for construction waste management.

What you must deliver

Shop drawings, Product data, Samples, Warranties, Operating and maintenance manuals, As-built drawings, Imported materials certification

How it's scored

Compliance with construction documents, quality of materials, performance by contractor

Hear what Lowell Joint plans next before it's posted.

Get alerts free

Free account · 30-second setup · No credit card

Summary

Lowell Joint School District is soliciting bids for the construction of a new Modular Classroom Building at Olita Elementary School, located at 950 Briercliff Dr., La Habra, CA 90631.

The project, identified by Application No. 03-125787 and File No. 19-65, encompasses a comprehensive scope including site clearing, earthwork, concrete paving, structural steel, cold-formed metal framing, and electrical systems (including EV chargers and photovoltaic power). The work also involves communications systems, fire alarms, and exterior improvements such as chain link fencing and irrigation. The project manual specifies administrative requirements for submittals, testing and inspection (DSA 103), and storm water pollution prevention. Bidders must coordinate with Ghataode Bannon Architects, LLP and RTM Engineering Consultants. The document establishes a 75% salvage/recycling rate for construction waste management.

EVALUATION CRITERIA

3
  • Compliance with construction documents
  • Quality of materials
  • Performance by contractor

REQUIRED DELIVERABLES

7
  • Shop drawings
  • Product data
  • Samples
  • Warranties
  • Operating and maintenance manuals
  • As-built drawings
  • Imported materials certification

REQUIRED ATTACHMENTS

4
  • Olita DSA 103
  • Olita Geotechnical Investigation
  • Olita Plans
  • Olita Specification
Scope location
La Habra, CA
Reported agency
Lowell Joint School District

Questions about this BID

How do I respond to this Bid from Lowell Joint?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is April 30, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation.

Can small businesses or minority-owned firms bid on this Bid?

Most government agencies, including Lowell Joint in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the Bid submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

What are the key deliverables?

The solicitation specifies the following deliverables: Shop drawings, Product data, Samples, Warranties, Operating and maintenance manuals, As-built drawings, Imported materials certification. Proposals should clearly address how each deliverable will be met.

Show 4 more questions

What are the evaluation criteria for this solicitation?

This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Compliance with construction documents, quality of materials, performance by contractor" Vendors should carefully align their proposals with each criterion to maximize their score.

Where can I find more RFPs from Lowell Joint?

All active and historical solicitations from Lowell Joint are tracked and searchable. As a school agency, Lowell Joint regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What documents are required to bid on this Bid?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Olita DSA 103, Olita Geotechnical Investigation, Olita Plans, Olita Specification. Review the full document from Lowell Joint for the complete list.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: La Habra, CA. Review the full solicitation for detailed scope requirements.

Work in government? Get Civic IQ free →

Start finding government buyers today.
It's free.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Get started free

No credit card required