BIDCLOSED
Save

Lee County - Big Carlos Pass Park Enhancement and Operational Upgrade - B260314SAG Addendum 4 (2026)

Lee County logoLee County
Due
Oct 13, 2026
Deadline passed
Posted
Aug 14, 2026
Primary contact
Shelby Guttery
(239) 533-8839

The 30-second brief

What they're buying

Lee County, Florida is requesting bids for the enhancement and operational upgrade of the existing public parking facility located adjacent to Big Carlos Pass on Estero Boulevard. The work includes construction, site preparation, paving and resurfacing, striping, electrical conduits, power service, utility pipe installation, restroom trailer, parking pay station, fencing, bollards, bike racks, and landscaping. Sealed bids are due by October 13, 2026, at 2:30 PM (ET) and must be submitted electronically via Ion Wave or hand-delivered to the Procurement Management Department at 2115 Second Street, 1st Floor, Fort Myers, FL 33901. A non-mandatory pre-bid meeting was held on August 27, 2026, and the question deadline was September 29, 2026.

What you must deliver

Mobilization, Maintenance of Traffic, Soil Tracking Prevention Device, Inlet Protection System, Removal of Existing Concrete, Bollards, 28' Vehicular Fence Gate, Restroom Trailer, Parking Pay Station, Post and Rope, 7 Loop Wave Bike Rack, Bumper Guards (Rubber), Single Column ground Sign Assembly, Landscape Complete (Small Plants), Irrigation System, Park Entry Sign, Park Rules Sign, Conduit, Electrical Power Service (Overhead), Electrical Service Wire, Electrical Service Disconnect (Cabinet), Electrical Power Service (Transformer), Utility Pipe (Poly Vinyl Chloride and High Density Polyethylene, Water/Sewer), Utility Fittings for PVC Pipe, Utility Fixture (Valve Assembly), Fire Hydrant

Hear what Lee County plans next before it's posted.

Get alerts free

Free account · 30-second setup · No credit card

Summary

Lee County, Florida is requesting bids for the enhancement and operational upgrade of the existing public parking facility located adjacent to Big Carlos Pass on Estero Boulevard.

The work includes construction, site preparation, paving and resurfacing, striping, electrical conduits, power service, utility pipe installation, restroom trailer, parking pay station, fencing, bollards, bike racks, and landscaping. Sealed bids are due by October 13, 2026, at 2:30 PM (ET) and must be submitted electronically via Ion Wave or hand-delivered to the Procurement Management Department at 2115 Second Street, 1st Floor, Fort Myers, FL 33901. A non-mandatory pre-bid meeting was held on August 27, 2026, and the question deadline was September 29, 2026.

REQUIRED DELIVERABLES

26
  • Mobilization
  • Maintenance of Traffic
  • Soil Tracking Prevention Device
  • Inlet Protection System
  • Removal of Existing Concrete
  • Bollards
  • 28' Vehicular Fence Gate
  • Restroom Trailer
  • Parking Pay Station
  • Post and Rope
  • 7 Loop Wave Bike Rack
  • Bumper Guards (Rubber)
  • Single Column ground Sign Assembly
  • Landscape Complete (Small Plants)
  • Irrigation System
  • Park Entry Sign
  • Park Rules Sign
  • Conduit
  • Electrical Power Service (Overhead)
  • Electrical Service Wire
  • Electrical Service Disconnect (Cabinet)
  • Electrical Power Service (Transformer)
  • Utility Pipe (Poly Vinyl Chloride and High Density Polyethylene, Water/Sewer)
  • Utility Fittings for PVC Pipe
  • Utility Fixture (Valve Assembly)
  • Fire Hydrant

REQUIRED ATTACHMENTS

12
  • Sunbiz Registration
  • Sub-Contractor Consultant List
  • Affidavit of Immigration Laws E-Verify
  • Vendor Background Screening Affidavit
  • Public Entity Crime Form
  • Negligence Breach and or Non-Compliance Disclosure Form
  • Bid Bond
  • Trench Safety
  • Affidavit Sections 287.138 and 787.06
  • Lee County Insurance Requirement
  • Scrutinized Companies Certification
  • Business Relationship Disclosure
Submit to
https://leegov.ionwave.net / Procurement Management Department, 2115 Second Street, 1st Floor, Fort Myers, FL 33901
Scope location
Fort Myers, FL

Questions about this BID

How do I respond to this Bid from Lee County?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is October 13, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: https://leegov.ionwave.net / Procurement Management Department, 2115 Second Street, 1st Floor, Fort Myers, FL 33901. For questions, contact Shelby Guttery.

Can small businesses or minority-owned firms bid on this Bid?

Most government agencies, including Lee County in FL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the Bid submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

Can I ask questions about this solicitation before submitting?

Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Shelby Guttery at (239) 533-8839. Questions and answers are typically shared with all prospective bidders.

What are the key deliverables?

The solicitation specifies the following deliverables: Mobilization, Maintenance of Traffic, Soil Tracking Prevention Device, Inlet Protection System, Removal of Existing Concrete, Bollards, 28' Vehicular Fence Gate, Restroom Trailer, Parking Pay Station, Post and Rope, 7 Loop Wave Bike Rack, Bumper Guards (Rubber), Single Column ground Sign Assembly, L. Proposals should clearly address how each deliverable will be met.

Show 3 more questions

Where can I find more RFPs from Lee County?

All active and historical solicitations from Lee County are tracked and searchable. As a county agency, Lee County regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What documents are required to bid on this Bid?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Sunbiz Registration, Sub-Contractor Consultant List, Affidavit of Immigration Laws E-Verify, Vendor Background Screening Affidavit, Public Entity Crime Form, Negligence Breach and or Non-Compliance Di. Review the full document from Lee County for the complete list.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: Fort Myers, FL. Review the full solicitation for detailed scope requirements.

Work in government? Get Civic IQ free →

Start finding government buyers today.
It's free.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Get started free

No credit card required