Lawrence Street Sewer Separation
- Posted
- Nov 20, 2025
- Primary contact
- Mike Connelly
- (360) 301-8717
The 30-second brief
The City of Port Townsend is soliciting bids for the Lawrence Street Sewer Separation project. The scope of work involves comprehensive civil infrastructure improvements including existing site demolition, alignment control, and the installation of new water mains, sewer mains, and stormwater systems. Roadway work includes paving, HMA (hot mixed asphalt), concrete curb and gutter, sidewalk repair, and roadway marking. Specific project elements include CIPP (cured in place pipe) sewer main, bioretention cell plans, and utility relocations for water and storm drainage. The project area covers Lawrence Street from Harrison Street to Monroe Street. Contact Mike Connelly, P.E. (Project Manager) at 360-301-8717 or Bret Beaupain, P.E. (RH2 Engineering) at 360-319-8089 for information. Drawings are at the 30-percent review stage as of November 20, 2025.
Demolition and alignment control plans, Water main installation, Sewer main installation, Stormwater plan and profile, Roadway marking
Hear what Port Townsend plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The City of Port Townsend is soliciting bids for the Lawrence Street Sewer Separation project.
The scope of work involves comprehensive civil infrastructure improvements including existing site demolition, alignment control, and the installation of new water mains, sewer mains, and stormwater systems. Roadway work includes paving, HMA (hot mixed asphalt), concrete curb and gutter, sidewalk repair, and roadway marking. Specific project elements include CIPP (cured in place pipe) sewer main, bioretention cell plans, and utility relocations for water and storm drainage. The project area covers Lawrence Street from Harrison Street to Monroe Street. Contact Mike Connelly, P.E. (Project Manager) at 360-301-8717 or Bret Beaupain, P.E. (RH2 Engineering) at 360-319-8089 for information. Drawings are at the 30-percent review stage as of November 20, 2025.
REQUIRED DELIVERABLES
5- Demolition and alignment control plans
- Water main installation
- Sewer main installation
- Stormwater plan and profile
- Roadway marking
REQUIRED ATTACHMENTS
8- General Notes
- Summary of Quantities
- Subsurface Utility Legend
- Abbreviations
- Contact Personnel
- Project Vicinity Map
- Project Location Map
- Survey Notes
- Scope location
- Port Townsend, WA
Questions about this BID
How do I respond to this Bid from City of Port Townsend?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. For questions, contact Mike Connelly.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including City of Port Townsend in WA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Mike Connelly at (360) 301-8717. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Demolition and alignment control plans, Water main installation, Sewer main installation, Stormwater plan and profile, Roadway marking. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from City of Port Townsend?
All active and historical solicitations from City of Port Townsend are tracked and searchable. As a city agency, City of Port Townsend regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: General Notes, Summary of Quantities, Subsurface Utility Legend, Abbreviations, Contact Personnel, Project Vicinity Map, Project Location Map, Survey Notes. Review the full document from City of Port Townsend for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Port Townsend, WA. Review the full solicitation for detailed scope requirements.