RFQCLOSED
Save

Austin Community College District - Highland Campus South Parking Garage Rooftop Solar Arrays System - #906-26-261-00-S-AB-RFQ

Austin Community College District logoAustin Community College District
Due
Feb 11, 2026
Deadline passed
Posted
Jan 15, 2026
Duration
6 months
Primary contact
Anthony Barron
(512) 223-1039

The 30-second brief

What they're buying

Austin Community College District is seeking qualifications from experienced design-build firms for the Highland Campus South Parking Garage Rooftop Solar Arrays System Design-Build Project. The project involves a 240 kW photovoltaic (PV) system with a $1,200,000 budget, including structural support framing, solar photovoltaic modules, DC-AC inverters, electrical transformers, conduit, wiring, and integration with ACC's eGauge monitoring system. Work also requires relocating or replacing 15 existing pole lights and security cameras, obtaining building and electrical permits, complying with Austin Energy's Rebate/Solar CBI program and federal tax credits under the Inflation Reduction Act. Responses are due by February 11, 2026, at 12:00 p.m. CST, via Workday Strategic Sourcing. An optional solicitation conference and site visit are scheduled for January 28, 2026.

What you must deliver

Photovoltaic (PV) modules, DC-AC inverters, Electrical transformers, Electrical connectors, Wiring, Conduit, Switches, Boxes, System monitoring and networking equipment, Structural support frames, Mountings, Pedestals, Beams, Columns, Piers, And footings for inverter housing structure, Structural support beams and racking platforms, Complete system design services, Relocation or replacement of fifteen (15) existing pole lights, Relocation of security cameras, Professional services for building and electrical permits, Complete system documentation in AutoCAD 2020 or later, Training to ACC personnel

How it's scored

Technical competence and relevant experience (30%), Quality and completeness of the firm's qualifications (25%), Qualifications and adequacy of the firm's proposed warranty and training program (10%), Qualifications and demonstrated understanding of applicable tax credits and incentives (10%), Costing methodology, general conditions, proposed design, and projected value of overall system (25%)

Hear what Austin Community College District plans next before it's posted.

Get alerts free

Free account · 30-second setup · No credit card

Summary

Austin Community College District is seeking qualifications from experienced design-build firms for the Highland Campus South Parking Garage Rooftop Solar Arrays System Design-Build Project.

The project involves a 240 kW photovoltaic (PV) system with a $1,200,000 budget, including structural support framing, solar photovoltaic modules, DC-AC inverters, electrical transformers, conduit, wiring, and integration with ACC's eGauge monitoring system. Work also requires relocating or replacing 15 existing pole lights and security cameras, obtaining building and electrical permits, complying with Austin Energy's Rebate/Solar CBI program and federal tax credits under the Inflation Reduction Act. Responses are due by February 11, 2026, at 12:00 p.m. CST, via Workday Strategic Sourcing. An optional solicitation conference and site visit are scheduled for January 28, 2026.

EVALUATION CRITERIA

Technical competence and relevant experience (30%), Quality and completeness of the firm's qualifications (25%), Qualifications and adequacy of the firm's proposed warranty and training program (10%), Qualifications and demonstrated understanding of applicable tax credits and incentives (10%), Costing methodology, general conditions, proposed design, and projected value of overall system (25%)

REQUIRED DELIVERABLES

23
  • Photovoltaic (PV) modules
  • DC-AC inverters
  • Electrical transformers
  • Electrical connectors
  • Wiring
  • Conduit
  • Switches
  • Boxes
  • System monitoring and networking equipment
  • Structural support frames
  • Mountings
  • Pedestals
  • Beams
  • Columns
  • Piers
  • Footings for inverter housing structure
  • Structural support beams and racking platforms
  • Complete system design services
  • Relocation or replacement of fifteen (15) existing pole lights
  • Relocation of security cameras
  • Professional services for building and electrical permits
  • Complete system documentation in AutoCAD 2020 or later
  • Training to ACC personnel

REQUIRED ATTACHMENTS

Completed and signed Certification Form (Exhibit A), Completed SBDP Forms (Exhibits B1 and/or B2), Respondent's Affidavit of Non-Collusion (Exhibit C-1), Conflict of Interest Questionnaire (Exhibit C-2), Certification - Provisions of the Texas Government Code Sections 2271.002 and 2274.002 (Exhibit E), Proof of Insurability (General Liability, Workers' Compensation, IRS W-9), evidence of licensure, Signed Addendum/Addenda

Submit to
https://us.workdayspend.com/rfps/public/987302
Scope location
Austin, TX

Questions about this RFQ

How do I respond to this RFQ from Austin Community College District?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is February 11, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: https://us.workdayspend.com/rfps/public/987302. For questions, contact Anthony Barron.

Can small businesses or minority-owned firms bid on this RFQ?

Most government agencies, including Austin Community College District in TX, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the RFQ submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

Can I ask questions about this solicitation before submitting?

Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Anthony Barron at (512) 223-1039. Questions and answers are typically shared with all prospective bidders.

What are the key deliverables?

The solicitation specifies the following deliverables: Photovoltaic (PV) modules, DC-AC inverters, Electrical transformers, Electrical connectors, Wiring, Conduit, Switches, Boxes, System monitoring and networking equipment, Structural support frames, Mountings, Pedestals, Beams, Columns, Piers, And footings for inverter housing structure, Structural su. Proposals should clearly address how each deliverable will be met.

Show 5 more questions

What are the evaluation criteria for this solicitation?

This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Technical competence and relevant experience (30%), Quality and completeness of the firm's qualifications (25%), Qualifications and adequacy of the firm's proposed warranty and training program (10%),..." Vendors should carefully align their proposals with each criterion to maximize their score.

Where can I find more RFPs from Austin Community College District?

All active and historical solicitations from Austin Community College District are tracked and searchable. As a higher ed agency, Austin Community College District regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What is the contract term for this solicitation?

The anticipated contract term is 6 months. Contract terms may include renewal options.

What documents are required to bid on this RFQ?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Completed and signed Certification Form (Exhibit A), Completed SBDP Forms (Exhibits B1 and/or B2), Respondent's Affidavit of Non-Collusion (Exhibit C-1), Conflict of Interest Questionnaire (Exhibit C-. Review the full document from Austin Community College District for the complete list.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: Austin, TX. Review the full solicitation for detailed scope requirements.

Work in government? Get Civic IQ free →

Start finding government buyers today.
It's free.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Get started free

No credit card required