Water tower circulation pump proposal
City of MarathonWisconsin- Detected
- Oct 28, 2026
- 10 days ago
- Sector
- Equipment
- Est. value
- Free account
Get pre-RFPs like this one before they're bid.
Get briefs like this freeFree account · 30-second setup · No credit card
From the meeting
, Inc. for a circulating system in the 75,000 Gallon Single Pedestal Water Tower. The proposal priced labor and materials at $19,000 and described installing a 1-1/2 HP circulating pump, couplings, PEX pipe, steel pipe, and winter circulation to prevent freezing.
The packet also attached a second Lane Tank proposal for a GridBee GS-9 mixer at $25,600, with an optional $2,530 NEMA 4 box with SCADA monitoring capabilities. Decision state: discussed/possible action, not shown as approved in the packet.
- Meeting date
- October 28, 2026
- Agency
- City of Marathon
Questions about this project
What is a pre-RFP?
A pre-RFP is an early indicator that a government agency is planning a purchase — a project discussed in a board meeting, a budget line item, a new hire, or a grant award — captured before a formal RFP or bid is published. Acting on pre-RFPs gives SLED and B2G vendors months of lead time to build relationships and shape requirements.
When will City of Marathon issue an RFP for this project?
Pre-RFPs typically surface 6–18 months before a formal solicitation is published. Civic IQ tracks City of Marathon's meeting records, agendas, and budgets continuously and updates this pre-RFP as the project moves through the buying cycle toward an RFP.
How can vendors engage with City of Marathon before the RFP is published?
Vendors who reach out during the planning window can help shape requirements and build relationships with the decision-makers running the project. A free Civic IQ account sends you the pre-RFPs that fit what you sell, with the AI brief and the decision makers for the top matches in each digest.
Where can I find more equipment government opportunities in Wisconsin?
Civic IQ monitors board meetings, agendas, budgets, and capital plans from 100,000+ state and local agencies and surfaces equipment pre-RFPs in Wisconsin as soon as they appear — months before they reach bid portals.