Clackamas County Government Contracts, RFPs & Bids

Browse government projects, RFPs, and bids from 43 agencies in Clackamas County, Oregon.

ORUpdated weekly
53Projects
43Agencies
12Sectors

Clackamas County is planning your next contract right now.

We read every board minute and budget in Clackamas County. You get the projects — with decision-maker contacts — before the RFP.

Trusted by teams at

Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo

Recent Projects

Government Projects in Clackamas County

53 projects across 10 agencies — sorted by relevance and recency.

Gladstone SD approved referring a $55.3 million general obligation bond measure for November 2026 to fund safety, security, repairs, accessibility, and facility upgrades. If passed, the bond would also trigger a $10.2 million state capital improvement match, funding projects like fire/alert systems, security cameras and access control, roof and HVAC work, asbestos/mold abatement, playground and athletic facility upgrades, and furnishings/equipment. Vendors in construction, engineering, security, building systems, and FF&E should track this bond; if it passes, the district will need multiple design, build, and implementation contracts over several years, coordinated by facilities and finance leadership.

Pre-RFP
$55,300,000Jul 8, 2026

Sunrise plans to demolish the seismically deficient Sunnyside Reservoir and replace it with an elevated tank creating a new 750-foot zone to serve Pleasant Valley–North Carver areas above 470 feet. This requires the elevated tank (Reservoir 13), new pump stations, and extensive 12–18" backbone from Carver to SE Foster Rd and SE Winston Ln. No procurement is specified, so design, modeling, and construction planning remain open.

Pre-RFP
$13,980,000Jul 1, 2026

Sunrise operates ASR Well 2W under a limited state license and plans to rehab it by 2027 and add 3–4 more ASR wells, targeting up to 300–600 MG of storage and 5 mgd production over 60 days. The CIP allocates $6M for new ASR 2 and 3 wells plus future ASR 4, contingent on permit renewal. Hydrogeology, well design, permitting, and ASR operations support are still open needs.

Pre-RFP
$6,000,000Jul 1, 2026

The draft master plan calls for a new 3 MG Reservoir 12 in Pressure Zone 6/11 near SE Sunnyside Rd and SE Youngs Lane, plus major associated pumping and transmission. This is central to serving East Happy Valley growth and must be in place before a new 750-foot zone can operate. No designer or builder is named yet, so Sunrise will need planning, design, permitting, and construction support over the next decade.

Pre-RFP
$38,615,000Jul 1, 2026

Sunrise Water Authority reviewed a draft 2026 Water Master Plan that lays out $120.3 million in new capital improvements plus $50.9 million in key replacements through roughly 2045. The plan calls for a new 750-foot pressure zone to serve the Pleasant Valley–North Carver area, new ASR wells, and seismic-resilient storage, transmission, and distribution upgrades. This is a long pipeline of design, engineering, construction, and program management work that has not yet been fully scoped into individual projects, giving vendors time to shape solutions and funding strategies.

Pre-RFP
$171,200,000Jun 24, 2026

North Clackamas School District is moving a $245 million capital construction bond toward the November 2026 ballot, with focus on safety, roofs, ventilation/comfort, critical maintenance, technology, and CTE-related facilities. The board is being asked on June 18, 2026 to approve the GO bond resolution and ballot language, which would maintain the current tax rate of about $2.37 per $1,000 AV. If voters approve, this will fund multi-year facility upgrades and technology infrastructure work that is not yet scoped to specific vendors, creating a pipeline of future construction, engineering, IT, security, and facility projects.

Pre-RFP
$245,000,000Jun 18, 2026

North Clackamas School District is moving a $245 million General Obligation capital construction bond to the November 3, 2026 ballot. The 10-year facility plan and bond advisory committee define work such as major maintenance, HVAC and ventilation upgrades, tech infrastructure, safety/security systems, CTE spaces, and new stadiums at two high schools. If voters approve, the district will need design, construction, technology, and security partners across multiple sites and project phases.

Pre-RFP
$245,000,000Jun 18, 2026

North Clackamas SD is placing a $245 million capital construction bond on the November 3, 2026 ballot to fund districtwide repairs and upgrades. Planned work includes critical maintenance, HVAC and ventilation, technology infrastructure, safety and security systems, CTE/vocational spaces, and new stadiums at Milwaukie and Rex Putnam High Schools. If approved, this will trigger multi‑year design, construction, technology, and security procurements, with summer 2027 projects already being planned.

Pre-RFP
$245,000,000Jun 18, 2026

Clackamas Community College approved a contract with Kirby Nagelhout Construction Company to renovate and upgrade the Campus Services Maintenance Yard. Work includes new paving, added storage, a new grounds/staff building, parking canopies for fleet vehicles, and utility coordination with adjacent and future projects, funded by the 2024 GO bond. The main award is decided, but there may be follow-on needs for site equipment, building systems, security, and future capital projects tied to this bond program.

Contract Award
$3,546,000Jul 15, 2026

The board is being asked on July 15, 2026 to approve Resolution R26/27-3, awarding a $3,546,000 contract to Kirby Nagelhout Construction Company to renovate and upgrade the Campus Services Maintenance Yard using 2024 GO bond funds. Work includes paving, utilities, fueling and wash facilities, new equipment and storage buildings, fleet parking canopies, enhanced security, and added fencing, plus utilities for Organic Farm improvements. The main build vendor is chosen, but there is potential follow-on demand for site security, fueling systems, fleet equipment, and building systems integration through April 2027.

Contract Award
$3,546,000Jul 15, 2026

Showing 10 of 53

Explore Clackamas County's government projects — free.

Self-serve. No call required. Live data in minutes.

Try Civic IQ for free →

Frequently Asked Questions

Procurement FAQs for Clackamas County, Oregon

Bring us your territory.
We'll show you what is forming.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Try Civic IQ for free