Washington County - Construction of Flood Mitigation Infrastructure at Legacy Park - 2026
- Due
- Sep 30, 2026
- Deadline passed
- Posted
- Sep 2, 2026
- Duration
- 3 months
- Primary contact
- Elliott Taylor
- (435) 301-7671
The 30-second brief
Washington County Legacy Park is seeking competitive construction bids for the physical construction of a new detention basin and associated earthen drainage infrastructure, channels, and spillways to improve flood mitigation and storm water handling capabilities. The scope of work involves detention excavation, imported embankment structural fill and compaction, 24" CMP culvert installation, anti-seep collars, pipe end sections, grouted rip-rap spillway aprons, precast catch basins with grates, multi-stage outlets, concrete pads, channel cutting, hydroseeding with native mix, SWPPP compliance, erosion control, and dust control. Bids must be submitted by September 30th, 2026 at 2:00 PM MST to the Washington County Public Works Department located at 111 East Tabernacle, St. George, Utah 84770. A mandatory pre-bid meeting and site visit will be held on September 23rd, 2026 at 9:00 AM MST at the Legacy Park Fairgrounds Harmony Building. Project timeline is 30 to 45 days with a contract time of 90 calendar days to substantial completion. A 100% performance bond and 100% payment bond are required, along with a bid bond in the amount of 5% of the bid. Bidders must hold a current Utah State Contractor's license.
Detention basin, Earthen drainage infrastructure, Channels, And spillways including mobilization, SWPPP compliance & erosion control, Dust control & watering, Clearing, Grubbing & demolition, Detention excavation/cut, On-site stockpiling, 6" rip rap 12" deep, Imported embankment structural fill/compaction, 24" CMP culvert, Anti-seep collar, Pipe end section, Spillway, 3'x3' precast w/ grate, Multi-stage outlet, Concrete pad, Channel cutting, Hydroseeding w/ native mix, Misc. parts, Fittings, Connections, And tie-ins
Lowest responsible bidder
Hear what Washington County plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Washington County Legacy Park is seeking competitive construction bids for the physical construction of a new detention basin and associated earthen drainage infrastructure, channels, and spillways to improve flood mitigation and storm water handling capabilities.
The scope of work involves detention excavation, imported embankment structural fill and compaction, 24" CMP culvert installation, anti-seep collars, pipe end sections, grouted rip-rap spillway aprons, precast catch basins with grates, multi-stage outlets, concrete pads, channel cutting, hydroseeding with native mix, SWPPP compliance, erosion control, and dust control. Bids must be submitted by September 30th, 2026 at 2:00 PM MST to the Washington County Public Works Department located at 111 East Tabernacle, St. George, Utah 84770. A mandatory pre-bid meeting and site visit will be held on September 23rd, 2026 at 9:00 AM MST at the Legacy Park Fairgrounds Harmony Building. Project timeline is 30 to 45 days with a contract time of 90 calendar days to substantial completion. A 100% performance bond and 100% payment bond are required, along with a bid bond in the amount of 5% of the bid. Bidders must hold a current Utah State Contractor's license.
EVALUATION CRITERIA
Lowest responsible bidder
REQUIRED DELIVERABLES
25- Detention basin
- Earthen drainage infrastructure
- Channels
- Spillways including mobilization
- SWPPP compliance & erosion control
- Dust control & watering
- Clearing
- Grubbing & demolition
- Detention excavation/cut
- On-site stockpiling
- 6" rip rap 12" deep
- Imported embankment structural fill/compaction
- 24" CMP culvert
- Anti-seep collar
- Pipe end section
- Spillway
- 3'x3' precast w/ grate
- Multi-stage outlet
- Concrete pad
- Channel cutting
- Hydroseeding w/ native mix
- Misc. parts
- Fittings
- Connections
- Tie-ins
REQUIRED ATTACHMENTS
4- Bid Form
- Bidder's General Information
- Bid Bond
- Power of Attorney
- Submit to
- Washington County Public Works Department, Washington County Office Building, 111 East Tabernacle, St. George, Utah 84770
- Scope location
- Hurricane, Utah
Questions about this BID
How do I respond to this Bid from Washington County?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 30, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: Washington County Public Works Department, Washington County Office Building, 111 East Tabernacle, St. George, Utah 84770. For questions, contact Elliott Taylor.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Washington County in UT, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Elliott Taylor at (435) 301-7671. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Detention basin, Earthen drainage infrastructure, Channels, And spillways including mobilization, SWPPP compliance & erosion control, Dust control & watering, Clearing, Grubbing & demolition, Detention excavation/cut, On-site stockpiling, 6" rip rap 12" deep, Imported embankment structural fill/comp. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Lowest responsible bidder" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Washington County?
All active and historical solicitations from Washington County are tracked and searchable. As a county agency, Washington County regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 3 months. Contract terms may include renewal options.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid Form, Bidder's General Information, Bid Bond, Power of Attorney. Review the full document from Washington County for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Hurricane, Utah. Review the full solicitation for detailed scope requirements.