University of California, Los Angeles - Cogeneration Plant New Electric Chiller Prequalification - Project No. 943904.01 (2026)
- Due
- Nov 5, 2026
- 2 days left
- Posted
- Oct 21, 2026
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
University of California, Los Angeles seeks prequalification for prime contractors for a CM at Risk contract for the Cogeneration Plant New Electric Chiller project, Project Number 943904.01, with an estimated construction cost of $29,175,806.00.
The 189,110 gross-square-foot facility provides electricity, steam, and chilled water to campus and the Ronald Reagan UCLA Medical Center (RRUMC). The scope includes installing a new high-efficiency electric centrifugal chiller, pumping system, multi-cell cooling tower, electrical infrastructure, step-down transformer, variable-frequency drive, and controls integration with the distributed control system. Bidders must hold a California B License (General Building), comply with prevailing wage requirements, UC Fair Wage, and Department of Industrial Relations (DIR) registration. Prequalification documents are available online at https://www.uclaplanroom.com. Submittals are due electronically via the UCLA Planroom website no later than 2:00 PM, Thursday, November 5, 2026.
- Submit to
- https://www.uclaplanroom.com
- Scope location
- Los Angeles, CA
- Projected sq ft
- 189,110 sq ft
- Reported agency
- University of California, Los Angeles
Questions about this RFSOQ
How do I respond to this RFSOQ from University Of California-Los Angeles?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 5, 2026. Submissions should be delivered to: https://www.uclaplanroom.com.
Can small businesses or minority-owned firms bid on this RFSOQ?
Most government agencies, including University Of California-Los Angeles in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFSOQ submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Show 4 more questions
Where can I find more RFPs from University Of California-Los Angeles?
All active and historical solicitations from University Of California-Los Angeles are tracked and searchable. As a higher ed agency, University Of California-Los Angeles regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of November 5, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this RFSOQ?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from University Of California-Los Angeles for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Los Angeles, CA. The total projected area is 189110 sq ft. Review the full solicitation for detailed scope requirements.