Troup County Board of Commissioners Fire Department Burn Building Buildout RFP 2026
- Due
- May 14, 2026
- Deadline passed
The 30-second brief
Troup County is soliciting proposals for the buildout of a Fire Department Burn Building at 2495 Hamilton Road, LaGrange, GA. The project includes site grading, installing five Conex containers, and connecting them to an existing structure.
Proposed construction drawings, Proposed construction specifications, Proposed construction schedule, Manufacturers' product warranties, Contractor's warranty, Final set of detailed construction drawings, Final set of construction specifications
Hear what Troup County plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Troup County is soliciting proposals for the buildout of a Fire Department Burn Building at 2495 Hamilton Road, LaGrange, GA. The project includes site grading, installing five Conex containers, and connecting them to an existing structure.
REQUIRED DELIVERABLES
7- Proposed construction drawings
- Proposed construction specifications
- Proposed construction schedule
- Manufacturers' product warranties
- Contractor's warranty
- Final set of detailed construction drawings
- Final set of construction specifications
REQUIRED ATTACHMENTS
Site Plan
- Scope location
- LaGrange, GA
- Reported agency
- Troup County Board of Commissioners
Questions about this RFP
How do I respond to this RFP from Troup County?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is May 14, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Troup County in GA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: Proposed construction drawings, Proposed construction specifications, Proposed construction schedule, Manufacturers' product warranties, Contractor's warranty, Final set of detailed construction drawings, Final set of construction specifications. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from Troup County?
All active and historical solicitations from Troup County are tracked and searchable. As a county agency, Troup County regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Site Plan. Review the full document from Troup County for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: LaGrange, GA. Review the full solicitation for detailed scope requirements.