Texas Facilities Commission - Replacement Dust Collection System TSD Woodshop IFB 0006613 (2026)
Texas Facilities Commission | State of TexasState · Austin, TX- Due
- Mar 12, 2026
- Deadline passed
- Posted
- Jan 21, 2026
- Primary contact
- Heather Goll
- (512) 463-0209
The 30-second brief
The Texas Facilities Commission (TFC) is soliciting bids for a turnkey replacement dust collection system in the woodshop at the Texas School for the Deaf (TSD) in Austin, TX, under solicitation ID 0006613. The scope includes demolition and proper disposal of the existing dust collection system, ducts, and related debris, site protection, and installation of a new dust collection system meeting OSHA and local building codes, NFPA fire codes, and proper CFM capacity requirements. Work encompasses ductwork, electrical connections, system testing, cleanup, and a 1-year minimum workmanship warranty. The response deadline is March 12, 2026, at 3:00 PM CT, with bids submitted via Bonfire. Contact Heather Goll at [email protected] or (512) 463-0209.
1. Demolition & Disposal of existing dust collection system, Ducts, And related debris; 2. New Dust Collection System Installation (Option 1 or Option 2: System Exhaust Outside); 3. Ductwork, Electrical, And ductwork replacement for support of new system; 4. Site Work & Restoration including utility locating, Daily debris removal, And final clean-up.
Hear what Texas Facilities Commission | State of Texas plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Texas Facilities Commission (TFC) is soliciting bids for a turnkey replacement dust collection system in the woodshop at the Texas School for the Deaf (TSD) in Austin, TX, under solicitation ID 0006613.
The scope includes demolition and proper disposal of the existing dust collection system, ducts, and related debris, site protection, and installation of a new dust collection system meeting OSHA and local building codes, NFPA fire codes, and proper CFM capacity requirements. Work encompasses ductwork, electrical connections, system testing, cleanup, and a 1-year minimum workmanship warranty. The response deadline is March 12, 2026, at 3:00 PM CT, with bids submitted via Bonfire. Contact Heather Goll at [email protected] or (512) 463-0209.
REQUIRED DELIVERABLES
1. Demolition & Disposal of existing dust collection system, Ducts, And related debris; 2. New Dust Collection System Installation (Option 1 or Option 2: System Exhaust Outside); 3. Ductwork, Electrical, And ductwork replacement for support of new system; 4. Site Work & Restoration including utility locating, Daily debris removal, And final clean-up.
REQUIRED ATTACHMENTS
Addendum 1 IFB 0006613 TSD Dust Collection System .docx
- Submit to
- https://tfcstate.bonfirehub.com/opportunities/217927
- Scope location
- Austin, TX
- Reported agency
- Texas Facilities Commission
Questions about this IFB
How do I respond to this IFB from Texas Facilities Commission | State of Texas?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is March 12, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: https://tfcstate.bonfirehub.com/opportunities/217927. For questions, contact Heather Goll.
Can small businesses or minority-owned firms bid on this IFB?
Most government agencies, including Texas Facilities Commission | State of Texas in TX, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the IFB submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Heather Goll at (512) 463-0209. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: 1. Demolition & Disposal of existing dust collection system, Ducts, And related debris; 2. New Dust Collection System Installation (Option 1 or Option 2: System Exhaust Outside); 3. Ductwork, Electrical, And ductwork replacement for support of new system; 4. Site Work & Restoration including utility. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from Texas Facilities Commission | State of Texas?
All active and historical solicitations from Texas Facilities Commission | State of Texas are tracked and searchable. As a state agency, Texas Facilities Commission | State of Texas regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this IFB?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Addendum 1 IFB 0006613 TSD Dust Collection System .docx. Review the full document from Texas Facilities Commission | State of Texas for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Austin, TX. Review the full solicitation for detailed scope requirements.