Southgate Water District - 2026 Sewer Rehabilitation Project - CIPP Lining and Manhole Rehabilitation
Southgate Water DistrictUtility District · Centennial, CO- Due
- Jun 30, 2026
- Deadline passed
- Posted
- Jun 5, 2026
- Primary contact
- Erik Vik
- (605) 661-7098
The 30-second brief
Southgate Sanitation District seeks bids for the 2026 Sewer Rehabilitation Project in Centennial and Greenwood Village, Colorado. The work includes CIPP cured-in-place pipe lining of approximately 1,164 linear feet of 12-inch sewer and 6,244 linear feet of 8-inch sewer using UV-cured or steam-cured resin material. Additional work involves rehabilitating thirteen 5-foot diameter sanitary sewer manholes with 137 vertical feet of topcoat lining, raising two manhole rims, replacing one manhole rim, CCTV inspection, excavating, asphalt and concrete removal and replacement, and continuous temporary bypass pumping in live flow. Bids are due by June 30, 2026, at 1:00 PM. A virtual pre-bid conference is scheduled for June 18, 2026. A 10% bid bond is required, along with payment and performance bonds and insurance coverage for the successful bidder.
CIPP lining of approximately 1, 164-linear feet of 12-inch sewer using UV-cured resin material; CIPP lining of approximately 6, 244-linear feet of 8-inch sewer using UV-cured resin material or steam cured material; Rehabilitating thirteen (13), 5-foot diameter, Sanitary sewer manholes and 137-vertical feet of topcoat lining installed; Raising two (2) manhole rims 6-inches above grade and replacing one (1) manhole rim; Continuous sewer bypassing
Price
Hear what Southgate Water District plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Southgate Sanitation District seeks bids for the 2026 Sewer Rehabilitation Project in Centennial and Greenwood Village, Colorado.
The work includes CIPP cured-in-place pipe lining of approximately 1,164 linear feet of 12-inch sewer and 6,244 linear feet of 8-inch sewer using UV-cured or steam-cured resin material. Additional work involves rehabilitating thirteen 5-foot diameter sanitary sewer manholes with 137 vertical feet of topcoat lining, raising two manhole rims, replacing one manhole rim, CCTV inspection, excavating, asphalt and concrete removal and replacement, and continuous temporary bypass pumping in live flow. Bids are due by June 30, 2026, at 1:00 PM. A virtual pre-bid conference is scheduled for June 18, 2026. A 10% bid bond is required, along with payment and performance bonds and insurance coverage for the successful bidder.
EVALUATION CRITERIA
Price
REQUIRED DELIVERABLES
5- CIPP lining of approximately 1, 164-linear feet of 12-inch sewer using UV-cured resin material
- CIPP lining of approximately 6, 244-linear feet of 8-inch sewer using UV-cured resin material or steam cured material
- Rehabilitating thirteen (13), 5-foot diameter, Sanitary sewer manholes and 137-vertical feet of topcoat lining installed
- Raising two (2) manhole rims 6-inches above grade and replacing one (1) manhole rim
- Continuous sewer bypassing
REQUIRED ATTACHMENTS
3- Bid Bond or certified check in the amount of 10% of the amount bid
- Payment and performance bonds
- Evidence of insurance coverage
- Submit to
- [email protected]
- Scope location
- Centennial, Colorado
Questions about this BID
How do I respond to this Bid from Southgate Water District?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is June 30, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: [email protected]. For questions, contact Erik Vik.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Southgate Water District in CO, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Erik Vik at (605) 661-7098. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: CIPP lining of approximately 1, 164-linear feet of 12-inch sewer using UV-cured resin material; CIPP lining of approximately 6, 244-linear feet of 8-inch sewer using UV-cured resin material or steam cured material; Rehabilitating thirteen (13), 5-foot diameter, Sanitary sewer manholes and 137-vertic. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Price" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Southgate Water District?
All active and historical solicitations from Southgate Water District are tracked and searchable. As a utility district agency, Southgate Water District regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid Bond or certified check in the amount of 10% of the amount bid; payment and performance bonds; evidence of insurance coverage. Review the full document from Southgate Water District for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Centennial, Colorado. Review the full solicitation for detailed scope requirements.