Santee School District is soliciting bids for the Rio Seco Elementary School Classroom Additions project. The comprehensive scope of work includes selective demolition, cast-in-place concrete (sand bed, vapor barrier, finishes), metal fabrications (angles, plates, railings, stairs), joint sealants, hollow metal doors and frames, and door hardware. The project also requires adherence to sustainable design requirements (CHPS Designed), commissioning of mechanical and electrical systems, and detailed closeout procedures including the submission of operation and maintenance (O&M) data, warranties, and project record documents. Contractors must manage construction waste, providing at least 50% recycling of non-hazardous debris. The specifications outline rigorous quality assurance, including daily cleaning inspections and third-party testing for concrete and commissioning.
Punch List, O&M Manuals, Warranties, Record Drawings, Final Verified Reports (Form DSA-6), CHPS Scorecard, Commissioning Report, Salvage Plan
Compliance with specifications, quality of materials, ability to meet CHPS sustainable design requirements, successful commissioning
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Santee School District is soliciting bids for the Rio Seco Elementary School Classroom Additions project.
The comprehensive scope of work includes selective demolition, cast-in-place concrete (sand bed, vapor barrier, finishes), metal fabrications (angles, plates, railings, stairs), joint sealants, hollow metal doors and frames, and door hardware. The project also requires adherence to sustainable design requirements (CHPS Designed), commissioning of mechanical and electrical systems, and detailed closeout procedures including the submission of operation and maintenance (O&M) data, warranties, and project record documents. Contractors must manage construction waste, providing at least 50% recycling of non-hazardous debris. The specifications outline rigorous quality assurance, including daily cleaning inspections and third-party testing for concrete and commissioning.
EVALUATION CRITERIA
4- Compliance with specifications
- Quality of materials
- Ability to meet CHPS sustainable design requirements
- Successful commissioning
REQUIRED DELIVERABLES
8- Punch List
- O&M Manuals
- Warranties
- Record Drawings
- Final Verified Reports (Form DSA-6)
- CHPS Scorecard
- Commissioning Report
- Salvage Plan
REQUIRED ATTACHMENTS
3- Warranty/Guaranty Form
- Construction Verification List
- Functional Performance Test List
- Scope location
- Santee, CA
- Reported agency
- Santee School District
Questions about this BID
How do I respond to this Bid from Santee?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Santee in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: Punch List, O&M Manuals, Warranties, Record Drawings, Final Verified Reports (Form DSA-6), CHPS Scorecard, Commissioning Report, Salvage Plan. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Compliance with specifications, quality of materials, ability to meet CHPS sustainable design requirements, successful commissioning" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Santee?
All active and historical solicitations from Santee are tracked and searchable. As a school agency, Santee regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Warranty/Guaranty Form, Construction Verification List, Functional Performance Test List. Review the full document from Santee for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Santee, CA. Review the full solicitation for detailed scope requirements.