San Lorenzo Valley Water District DWR Water Tanks Replacement Echo Tank Construction Plans 2025
- Posted
- Sep 12, 2025
The 30-second brief
The San Lorenzo Valley Water District (SLVWD) is soliciting bids for the DWR Water Tanks Replacement project, specifically the Echo Tank located in Boulder Creek, CA (APN 087-11117). The scope of work involves the installation of a new 120,000-gallon bolted steel water tank (29'-8" diameter, 32'-2" height) on a concrete ring foundation. Associated civil and structural work includes site grading, drainage improvements (new storm drains, under drains, and back drains), driveway profiling, and the construction of soldier beam retaining walls with tiebacks. The project also requires the demolition of existing water lines, wooden retaining walls, and a wooden tank. Contractors must be licensed and are responsible for underground utility location (USA North 811). The plans are currently at the 90% design stage for construction procurement.
Signed and stamped tank plans and calculations, Concrete mix designs, Steel soldier piles submittals, Shop drawings
Hear what San Lorenzo Valley Water District plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The San Lorenzo Valley Water District (SLVWD) is soliciting bids for the DWR Water Tanks Replacement project, specifically the Echo Tank located in Boulder Creek, CA (APN 087-11117).
The scope of work involves the installation of a new 120,000-gallon bolted steel water tank (29'-8" diameter, 32'-2" height) on a concrete ring foundation. Associated civil and structural work includes site grading, drainage improvements (new storm drains, under drains, and back drains), driveway profiling, and the construction of soldier beam retaining walls with tiebacks. The project also requires the demolition of existing water lines, wooden retaining walls, and a wooden tank. Contractors must be licensed and are responsible for underground utility location (USA North 811). The plans are currently at the 90% design stage for construction procurement.
REQUIRED DELIVERABLES
4- Signed and stamped tank plans and calculations
- Concrete mix designs
- Steel soldier piles submittals
- Shop drawings
REQUIRED ATTACHMENTS
Geotechnical Investigation Report
- Scope location
- Boulder Creek, CA
Questions about this BID
How do I respond to this Bid from San Lorenzo Valley Water District?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including San Lorenzo Valley Water District in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: Signed and stamped tank plans and calculations, Concrete mix designs, Steel soldier piles submittals, Shop drawings. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from San Lorenzo Valley Water District?
All active and historical solicitations from San Lorenzo Valley Water District are tracked and searchable. As a utility district agency, San Lorenzo Valley Water District regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Geotechnical Investigation Report. Review the full document from San Lorenzo Valley Water District for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Boulder Creek, CA. Review the full solicitation for detailed scope requirements.