Port of Los Angeles - Berths 49-51 Outer Harbor Cruise Terminal Development - Invitation 2815
- Due
- Nov 20, 2025
- Deadline passed
- Posted
- Sep 9, 2025
- Primary contact
- Erick Santillan Leon
- (310) 732-4037
Hear what The Port of Los Angeles plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Project consists of the construction of a new Los Angeles Department of Water and Power (LADWP) 34.5 kV Industrial Station, new 34.5 kV switchgear, new 18 MVA transformer equipped with Automatic Load Tap Change (ALTC), new 11 kV AMP switchgear, 2 new 11 kV wharf AMP outlets, and 11 kV AMP mobile cable management for cruise ships connections.
The project requires the extension of a new LADWP 34.5 kV circuit through existing underground conduit from 22nd Street to Berth 49 along Miner Street. Additional work includes Berths 49-50 wharf structural AMP, landside structural AMP support, concrete wharf repairs, hybrid fender backing panel with steel and timber piles, foam-filled fendering system, water lines, sewer connections, civil improvements for pedestrian and vehicular access, safety, and security, and site removals. Submission deadline is November 20, 2025.
- Submit to
- 425 South Palos Verdes Street, 3rd Floor, San Pedro, California, 90731
- Scope location
- San Pedro, California
- Reported agency
- Port of Los Angeles
Questions about this BID
How do I respond to this Bid from The Port of Los Angeles?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 20, 2025. Submissions should be delivered to: 425 South Palos Verdes Street, 3rd Floor, San Pedro, California, 90731. For questions, contact Erick Santillan Leon.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including The Port of Los Angeles in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Erick Santillan Leon at (310) 732-4037. Questions and answers are typically shared with all prospective bidders.
Show 3 more questions
Where can I find more RFPs from The Port of Los Angeles?
All active and historical solicitations from The Port of Los Angeles are tracked and searchable. As a public authority agency, The Port of Los Angeles regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from The Port of Los Angeles for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: San Pedro, California. Review the full solicitation for detailed scope requirements.