New Hampshire Department of Transportation Statewide Wrong Way Driving - 44866 X-A005(593)
New Hampshire Department of Transportation | State of New HampshireState · Concord, NH- Due
- Dec 3, 2026
- 19 days left
- Posted
- Nov 10, 2026
The 30-second brief
The New Hampshire Department of Transportation is seeking bids for the installation of wrong-way countermeasures at controlled access interchanges statewide, including Belknap, Cheshire, Grafton, Hillsborough, Merrimack, Rockingham, and Strafford counties. Project 44866 (X-A005(593)) encompasses traffic signs, pavement markings, portable changeable message signs, truck-mounted impact attenuators, structure excavation, traffic maintenance, and erosion control. Bids are due by December 3, 2026, and require a proposal guarantee of 5% of the bid amount. The contract completion date is November 5, 2027.
PORTABLE CHANGEABLE MESSAGE SIGN PLATFORM, COMMON STRUCTURE EXCAVATION EXPLORATORY, TRAFFIC SIGN TYPE C, TRAFFIC SIGN TYPE C BREAKAWAY MOUNTS, REMOVING TRAFFIC SIGN TYPE C, RELOCATING TRAFFIC SIGN TYPE C, TRAFFIC SIGN TYPE CC, REMOVING TRAFFIC SIGN TYPE CC, RELOCATING TRAFFIC SIGN TYPE CC, UNIFORMED OFFICERS WITH VEHICLE, FLAGGERS, MAINTENANCE OF TRAFFIC, PORTABLE CHANGEABLE MESSAGE SIGN, TRUCK-MOUNTED IMPACT ATTENUATOR TEST LEVEL 3, RETROREFLECTIVE THERMOPLASTIC PAVEMENT MARKING 4" LINE, RETROREFLECTIVE THERMOPLASTIC PAVEMENT MARKING 18" LINE, GROOVED RETROREFLECTIVE THERMOPLASTIC PAVEMENT MARKING SYMBOL OR WORD, OBLITERATE PAVEMENT MARKING LINE OVER 12" WIDE, MOBILIZATION, MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL, FUEL ADJUSTMENT
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The New Hampshire Department of Transportation is seeking bids for the installation of wrong-way countermeasures at controlled access interchanges statewide, including Belknap, Cheshire, Grafton, Hillsborough, Merrimack, Rockingham, and Strafford counties.
Project 44866 (X-A005(593)) encompasses traffic signs, pavement markings, portable changeable message signs, truck-mounted impact attenuators, structure excavation, traffic maintenance, and erosion control. Bids are due by December 3, 2026, and require a proposal guarantee of 5% of the bid amount. The contract completion date is November 5, 2027.
REQUIRED DELIVERABLES
21- PORTABLE CHANGEABLE MESSAGE SIGN PLATFORM
- COMMON STRUCTURE EXCAVATION EXPLORATORY
- TRAFFIC SIGN TYPE C
- TRAFFIC SIGN TYPE C BREAKAWAY MOUNTS
- REMOVING TRAFFIC SIGN TYPE C
- RELOCATING TRAFFIC SIGN TYPE C
- TRAFFIC SIGN TYPE CC
- REMOVING TRAFFIC SIGN TYPE CC
- RELOCATING TRAFFIC SIGN TYPE CC
- UNIFORMED OFFICERS WITH VEHICLE
- FLAGGERS
- MAINTENANCE OF TRAFFIC
- PORTABLE CHANGEABLE MESSAGE SIGN
- TRUCK-MOUNTED IMPACT ATTENUATOR TEST LEVEL 3
- RETROREFLECTIVE THERMOPLASTIC PAVEMENT MARKING 4" LINE
- RETROREFLECTIVE THERMOPLASTIC PAVEMENT MARKING 18" LINE
- GROOVED RETROREFLECTIVE THERMOPLASTIC PAVEMENT MARKING SYMBOL OR WORD
- OBLITERATE PAVEMENT MARKING LINE OVER 12" WIDE
- MOBILIZATION
- MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL
- FUEL ADJUSTMENT
- Scope location
- Statewide, NH
- Reported agency
- New Hampshire Department of Transportation
Questions about this BID
How do I respond to this Bid from New Hampshire Department of Transportation | State of New Hampshire?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 3, 2026. The solicitation specifies required deliverables that must be addressed in your response.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including New Hampshire Department of Transportation | State of New Hampshire in NH, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: PORTABLE CHANGEABLE MESSAGE SIGN PLATFORM, COMMON STRUCTURE EXCAVATION EXPLORATORY, TRAFFIC SIGN TYPE C, TRAFFIC SIGN TYPE C BREAKAWAY MOUNTS, REMOVING TRAFFIC SIGN TYPE C, RELOCATING TRAFFIC SIGN TYPE C, TRAFFIC SIGN TYPE CC, REMOVING TRAFFIC SIGN TYPE CC, RELOCATING TRAFFIC SIGN TYPE CC, UNIFORMED. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
Where can I find more RFPs from New Hampshire Department of Transportation | State of New Hampshire?
All active and historical solicitations from New Hampshire Department of Transportation | State of New Hampshire are tracked and searchable. As a state agency, New Hampshire Department of Transportation | State of New Hampshire regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of December 3, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from New Hampshire Department of Transportation | State of New Hampshire for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Statewide, NH. Review the full solicitation for detailed scope requirements.