Gateway Services Community Development District - Lake Bank Restoration: Lake 43 - RFP-26-01-PW-0-2026/RP
- Due
- Dec 17, 2025
- Deadline passed
- Posted
- Nov 3, 2025
- Primary contact
- Randy Paniagua
The 30-second brief
Gateway Services Community Development District seeks lake bank restoration services for Lake 43, involving approximately 3,500 linear feet of shoreline within Pelican Preserve in Lee County, Florida. The scope of work includes placement of geotextile fabric and lime rock base/fill mix graded to a 4:1 slope, sodding, restoration of disturbed irrigation or staging areas, dewatering if needed, and verification of existing stormwater infrastructure. A non-mandatory pre-bid meeting is scheduled for November 18, 2025. Bid Security/Bond and a Public Construction Bond are required. The submission deadline is December 17, 2025.
Placement of geotextile fabric and lime rock base/fill mix, Graded to a 4:1 slope; Sodding and restoration of any disturbed irrigation or staging areas; Dewatering if needed and verification of existing stormwater infrastructure
Hear what Gateway Services Community Development District plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Gateway Services Community Development District seeks lake bank restoration services for Lake 43, involving approximately 3,500 linear feet of shoreline within Pelican Preserve in Lee County, Florida.
The scope of work includes placement of geotextile fabric and lime rock base/fill mix graded to a 4:1 slope, sodding, restoration of disturbed irrigation or staging areas, dewatering if needed, and verification of existing stormwater infrastructure. A non-mandatory pre-bid meeting is scheduled for November 18, 2025. Bid Security/Bond and a Public Construction Bond are required. The submission deadline is December 17, 2025.
REQUIRED DELIVERABLES
3- Placement of geotextile fabric and lime rock base/fill mix, Graded to a 4:1 slope
- Sodding and restoration of any disturbed irrigation or staging areas
- Dewatering if needed and verification of existing stormwater infrastructure
REQUIRED ATTACHMENTS
Bid Security/Bond, Public Construction Bond
- Submit to
- https://www.demandstar.com/app/limited/bids/513765/details
- Scope location
- Lee County, FL
- Reported agency
- Gateway Services Community Development District
Questions about this RFP
How do I respond to this RFP from Gateway Services Community Development District ?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 17, 2025. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: https://www.demandstar.com/app/limited/bids/513765/details. For questions, contact Randy Paniagua.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Gateway Services Community Development District in FL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Randy Paniagua. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Placement of geotextile fabric and lime rock base/fill mix, Graded to a 4:1 slope; Sodding and restoration of any disturbed irrigation or staging areas; Dewatering if needed and verification of existing stormwater infrastructure. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from Gateway Services Community Development District ?
All active and historical solicitations from Gateway Services Community Development District are tracked and searchable. As a special district agency, Gateway Services Community Development District regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid Security/Bond, Public Construction Bond. Review the full document from Gateway Services Community Development District for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Lee County, FL. Review the full solicitation for detailed scope requirements.