Energy Northwest Extended Power Uprate Balance of Plant Pipe Supports - No. 716569 (2026)
- Due
- Jun 23, 2026
- Deadline passed
- Posted
- May 1, 2026
- Primary contact
- Stacy Jackson
- (509) 377-8298
The 30-second brief
Energy Northwest is soliciting proposals for the Extended Power Uprate (EPU) balance of plant (BOP) pipe supports replacement project at Columbia Generating Station in Richland, Washington. The work involves modifying, removing, fabricating, and installing 10 EPU BOP pipe supports during Refuel Outage 28 in spring of 2027. Key components include main steam, heater drain, and condensate pipe supports across various turbine building elevations. Bidders must attend a mandatory teleconference on June 2, 2026, submit questions by June 9, 2026, and provide proposals by June 23, 2026. Requirements include Washington State contractor licensing, prevailing wage compliance under chapter 39.12 RCW, industrial insurance, and specific technical qualifications including means and methods and equipment lists.
Replace 10 EPU BOP pipe supports including MS-13, HD-465, COND-141, COND-151, HD-193, MS-128, MS-8, MS-193, HD-137, And S-1
General Qualifications 20%, Commercial Qualifications 20%, Technical Qualifications 60%
Get notified when Energy Northwest PUD posts the next one.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Energy Northwest is soliciting proposals for the Extended Power Uprate (EPU) balance of plant (BOP) pipe supports replacement project at Columbia Generating Station in Richland, Washington.
The work involves modifying, removing, fabricating, and installing 10 EPU BOP pipe supports during Refuel Outage 28 in spring of 2027. Key components include main steam, heater drain, and condensate pipe supports across various turbine building elevations. Bidders must attend a mandatory teleconference on June 2, 2026, submit questions by June 9, 2026, and provide proposals by June 23, 2026. Requirements include Washington State contractor licensing, prevailing wage compliance under chapter 39.12 RCW, industrial insurance, and specific technical qualifications including means and methods and equipment lists.
EVALUATION CRITERIA
3- General Qualifications 20%
- Commercial Qualifications 20%
- Technical Qualifications 60%
REQUIRED DELIVERABLES
10- Replace 10 EPU BOP pipe supports including MS-13
- HD-465
- COND-141
- COND-151
- HD-193
- MS-128
- MS-8
- MS-193
- HD-137
- S-1
REQUIRED ATTACHMENTS
3- Cost Proposal Form
- Exhibit A Proposed Subcontractors
- Exhibit B Certificate of Compliance with Wage Payment Statutes
- Submit to
- Email: [email protected]
- Scope location
- Richland, WA
- Reported agency
- Energy Northwest
Questions about this BID
How do I respond to this Bid from Energy Northwest PUD?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is June 23, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: Email: [email protected]. For questions, contact Stacy Jackson.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Energy Northwest PUD in WA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Stacy Jackson at (509) 377-8298. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Replace 10 EPU BOP pipe supports including MS-13, HD-465, COND-141, COND-151, HD-193, MS-128, MS-8, MS-193, HD-137, And S-1. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "General Qualifications 20%, Commercial Qualifications 20%, Technical Qualifications 60%" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Energy Northwest PUD?
All active and historical solicitations from Energy Northwest PUD are tracked and searchable. As a utility district agency, Energy Northwest PUD regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Cost Proposal Form, Exhibit A Proposed Subcontractors, Exhibit B Certificate of Compliance with Wage Payment Statutes. Review the full document from Energy Northwest PUD for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Richland, WA. Review the full solicitation for detailed scope requirements.