The 30-second brief
The City of Des Moines is seeking bids for the WRA Joint Trunk – Phase 14, Segment 3 project under solicitation number 072027001. The improvement includes construction of sanitary sewer, including excavation and backfill of approximately 12,903 feet of 60-inch and 3,749 feet of 66-inch sanitary sewer in open cut construction, and 2,426 feet of 60-inch and 565 feet of 66-inch sanitary sewer in trenchless construction. Additional work encompasses manholes and special structures, bypass pumping, dewatering, storm sewer replacement, water main replacement, Hot Mix Asphalt (HMA) and Portland Cement Concrete (PCC) replacement, temporary traffic control, erosion control, seeding, flow metering equipment and electrical service installation, cleanup, and miscellaneous work located along Walnut Creek from I-35/I-80 to 73rd Street. Submissions are due by December 1, 2026, at 5:00 PM.
Excavation and backfill of approximately 12, 903 feet of 60-inch and 3, 749 feet of 66-inch sanitary sewer in open cut construction; 2, 426 feet of 60-inch and 565 feet of 66-inch sanitary sewer in trenchless construction, Manholes and special structures, Bypass pumping, Dewatering, Storm sewer replacement, Water main replacement, Hot Mix Asphalt (HMA) and Portland Cement Concrete (PCC) replacement, Temporary traffic control, Erosion control, Seeding, Flow metering equipment and install with new electrical service, Cleanup, And miscellaneous work
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The City of Des Moines is seeking bids for the WRA Joint Trunk – Phase 14, Segment 3 project under solicitation number 072027001.
The improvement includes construction of sanitary sewer, including excavation and backfill of approximately 12,903 feet of 60-inch and 3,749 feet of 66-inch sanitary sewer in open cut construction, and 2,426 feet of 60-inch and 565 feet of 66-inch sanitary sewer in trenchless construction. Additional work encompasses manholes and special structures, bypass pumping, dewatering, storm sewer replacement, water main replacement, Hot Mix Asphalt (HMA) and Portland Cement Concrete (PCC) replacement, temporary traffic control, erosion control, seeding, flow metering equipment and electrical service installation, cleanup, and miscellaneous work located along Walnut Creek from I-35/I-80 to 73rd Street. Submissions are due by December 1, 2026, at 5:00 PM.
REQUIRED DELIVERABLES
Excavation and backfill of approximately 12, 903 feet of 60-inch and 3, 749 feet of 66-inch sanitary sewer in open cut construction; 2, 426 feet of 60-inch and 565 feet of 66-inch sanitary sewer in trenchless construction, Manholes and special structures, Bypass pumping, Dewatering, Storm sewer replacement, Water main replacement, Hot Mix Asphalt (HMA) and Portland Cement Concrete (PCC) replacement, Temporary traffic control, Erosion control, Seeding, Flow metering equipment and install with new electrical service, Cleanup, And miscellaneous work
- Submit to
- https://www.bidexpress.com/solicitations/49663
- Scope location
- Clive, West Des Moines, and Windsor Heights, IA
Questions about this BID
How do I respond to this Bid from City of Des Moines?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 1, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: https://www.bidexpress.com/solicitations/49663.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including City of Des Moines in IA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: Excavation and backfill of approximately 12, 903 feet of 60-inch and 3, 749 feet of 66-inch sanitary sewer in open cut construction; 2, 426 feet of 60-inch and 565 feet of 66-inch sanitary sewer in trenchless construction, Manholes and special structures, Bypass pumping, Dewatering, Storm sewer repl. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
Where can I find more RFPs from City of Des Moines?
All active and historical solicitations from City of Des Moines are tracked and searchable. As a city agency, City of Des Moines regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of December 1, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from City of Des Moines for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Clive, West Des Moines, and Windsor Heights, IA. Review the full solicitation for detailed scope requirements.