BIDCLOSED
Save

Alabama Department of Transportation Resurfacing and Traffic Stripe on CR-24 Bid 2026

AL-State-Alabama Department of Transportation logoAL-State-Alabama Department of Transportation
Due
Sep 25, 2026
Deadline passed

The 30-second brief

What they're buying

The Alabama Department of Transportation invites bids for resurfacing and traffic stripe on CR-24 in Russell, AL. Work includes 64,044 SY bituminous treatment g with polymer additive, 3,522 gal tack coat, Superpave bituminous concrete wearing surface and upper binder layers, aggregate surfacing, mobilization, construction fuel, and various solid and broken traffic stripes. Submission deadline is September 25, 2026, at 10:00 AM. Bids must be submitted to 1409 Coliseum Blvd PO Box 303050, Montgomery, AL 36110. This solicitation has local funding, and plans and bidding proposals may be purchased for $5.00 each.

What you must deliver

64, 044 SY bituminous treatment g (with polymer additive); 3, 522 gal tack coat; Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, Esal range a/b 5, 534 ton; Superpave bituminous concrete upper binder layer, Patching, 1" maximum aggregate size mix, Esal range a/b 395 ton; Superpave bituminous concrete upper binder layer, Leveling, 1/2" maximum aggregate size mix, Esal range a/b 255 ton; 1, 230 ton aggregate surfacing (1" down, Crusher run); Mobilization; Construction fuel; 11 mile solid white, Class 2, Type a traffic stripe; 7 mile solid yellow, Class 2, Type a traffic stripe; 4 mile broken yellow, Class 2, Type a traffic stripe; 7 mile broken temporary traffic stripe

Hear what AL-State-Alabama Department of Transportation plans next before it's posted.

Get alerts free

Free account · 30-second setup · No credit card

Summary

The Alabama Department of Transportation invites bids for resurfacing and traffic stripe on CR-24 in Russell, AL. Work includes 64,044 SY bituminous treatment g with polymer additive, 3,522 gal tack coat, Superpave bituminous concrete wearing surface and upper binder layers, aggregate surfacing, mobilization, construction fuel, and various solid and broken traffic stripes.

Submission deadline is September 25, 2026, at 10:00 AM. Bids must be submitted to 1409 Coliseum Blvd PO Box 303050, Montgomery, AL 36110. This solicitation has local funding, and plans and bidding proposals may be purchased for $5.00 each.

REQUIRED DELIVERABLES

12
  • 64, 044 SY bituminous treatment g (with polymer additive)
  • 3, 522 gal tack coat
  • Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, Esal range a/b 5, 534 ton
  • Superpave bituminous concrete upper binder layer, Patching, 1" maximum aggregate size mix, Esal range a/b 395 ton
  • Superpave bituminous concrete upper binder layer, Leveling, 1/2" maximum aggregate size mix, Esal range a/b 255 ton
  • 1, 230 ton aggregate surfacing (1" down, Crusher run)
  • Mobilization
  • Construction fuel
  • 11 mile solid white, Class 2, Type a traffic stripe
  • 7 mile solid yellow, Class 2, Type a traffic stripe
  • 4 mile broken yellow, Class 2, Type a traffic stripe
  • 7 mile broken temporary traffic stripe
Submit to
1409 Coliseum Blvd PO Box 303050, Montgomery, AL, 36110
Scope location
Russell, AL
Reported agency
Alabama Department of Transportation

Questions about this BID

How do I respond to this Bid from AL-State-Alabama Department of Transportation?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 25, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: 1409 Coliseum Blvd PO Box 303050, Montgomery, AL, 36110.

Can small businesses or minority-owned firms bid on this Bid?

Most government agencies, including AL-State-Alabama Department of Transportation in AL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the Bid submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

What are the key deliverables?

The solicitation specifies the following deliverables: 64, 044 SY bituminous treatment g (with polymer additive); 3, 522 gal tack coat; Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, Esal range a/b 5, 534 ton; Superpave bituminous concrete upper binder layer, Patching, 1" maximum aggregate size mix, Esal range a/b. Proposals should clearly address how each deliverable will be met.

Show 3 more questions

Where can I find more RFPs from AL-State-Alabama Department of Transportation?

All active and historical solicitations from AL-State-Alabama Department of Transportation are tracked and searchable. As a state agency, AL-State-Alabama Department of Transportation regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What documents are required to bid on this Bid?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from AL-State-Alabama Department of Transportation for the complete list.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: Russell, AL. Review the full solicitation for detailed scope requirements.

Work in government? Get Civic IQ free →

Start finding government buyers today.
It's free.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Get started free

No credit card required