Alabama Department of Transportation - Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) - 2026
- Due
- Sep 25, 2026
- Deadline passed
The 30-second brief
The Alabama Department of Transportation seeks bids for planing, resurfacing, and traffic stripe on SR-1 (US-431) located in Barbour, AL. The scope of work includes removing concrete sidewalk (289 SY), removing curb (1,962 LF), removing curb and gutter (44 LF), removing railroad tracks (115 LF), removing manholes (2 EA), unclassified excavation (2,292 CY), borrow excavation (70 CY), roadbed processing (8 rbst), crushed aggregate base course (6,979 SY), crushed aggregate for miscellaneous use (20 Ton), bituminous treatment a (6,979 SY), tack coat (3,409 Gal), and planing existing pavement (12,845 SY). The solicitation features some or all local funding. Bids are due by September 25, 2026, at 10:00 AM at 1409 Coliseum Blvd, Montgomery, AL.
289 SY removing concrete sidewalk, 1, 962 LF removing curb, 44 LF removing curb and gutter, 115 LF removing railroad tracks, 2 EA removing manholes, 2, 292 CY unclassified excavation, 70 CY borrow excavation (loose truckbed measurement) (a4 or better), 8 rbst roadbed processing, 6, 979 SY crushed aggregate base course, Type b, Road mixed, 6" compacted thickness, 20 Ton crushed aggregate, Section 825, Type b, For miscellaneous use, 6, 979 SY bituminous treatment a, 3, 409 Gal tack coat, 12, 845 SY planing existing pavement (approx 1.10" thru 2.0" thick)
Hear what AL-State-Alabama Department of Transportation plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Alabama Department of Transportation seeks bids for planing, resurfacing, and traffic stripe on SR-1 (US-431) located in Barbour, AL. The scope of work includes removing concrete sidewalk (289 SY), removing curb (1,962 LF), removing curb and gutter (44 LF), removing railroad tracks (115 LF), removing manholes (2 EA), unclassified excavation (2,292 CY), borrow excavation (70 CY), roadbed processing (8 rbst), crushed aggregate base course (6,979 SY), crushed aggregate for miscellaneous use (20 Ton), bituminous treatment a (6,979 SY), tack coat (3,409 Gal), and planing existing pavement (12,845 SY).
The solicitation features some or all local funding. Bids are due by September 25, 2026, at 10:00 AM at 1409 Coliseum Blvd, Montgomery, AL.
REQUIRED DELIVERABLES
25- 289 SY removing concrete sidewalk
- 1
- 962 LF removing curb
- 44 LF removing curb and gutter
- 115 LF removing railroad tracks
- 2 EA removing manholes
- 2
- 292 CY unclassified excavation
- 70 CY borrow excavation (loose truckbed measurement) (a4 or better)
- 8 rbst roadbed processing
- 6
- 979 SY crushed aggregate base course
- Type b
- Road mixed
- 6" compacted thickness
- 20 Ton crushed aggregate
- Section 825
- Type b
- For miscellaneous use
- 6
- 979 SY bituminous treatment a
- 3
- 409 Gal tack coat
- 12
- 845 SY planing existing pavement (approx 1.10" thru 2.0" thick)
- Submit to
- 1409 Coliseum Blvd PO Box 303050, Montgomery, AL, 36110
- Scope location
- Barbour, AL
- Reported agency
- Alabama Department of Transportation
Questions about this BID
How do I respond to this Bid from AL-State-Alabama Department of Transportation?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 25, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: 1409 Coliseum Blvd PO Box 303050, Montgomery, AL, 36110.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including AL-State-Alabama Department of Transportation in AL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: 289 SY removing concrete sidewalk, 1, 962 LF removing curb, 44 LF removing curb and gutter, 115 LF removing railroad tracks, 2 EA removing manholes, 2, 292 CY unclassified excavation, 70 CY borrow excavation (loose truckbed measurement) (a4 or better), 8 rbst roadbed processing, 6, 979 SY crushed ag. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from AL-State-Alabama Department of Transportation?
All active and historical solicitations from AL-State-Alabama Department of Transportation are tracked and searchable. As a state agency, AL-State-Alabama Department of Transportation regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from AL-State-Alabama Department of Transportation for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Barbour, AL. Review the full solicitation for detailed scope requirements.