Avery Energy Named Secondary Water Meter Vendor
Trusted by teams at
Description
Avery Energy’s $499-per-meter bid for water meter installation was accepted as a secondary option, to be used if the primary contractor Bevins Construction cannot perform. The town established this backup to ensure continuity of the water meter project.
Contract Details
Contract Amount
$499 per meter (secondary bid)
Vendor
AVERY ENERGY
Agency
Crown Point Wd, NY
Contract Type
CONSTRUCTION
Document Date
March 12, 2026