WSDOT SR 28, EWC 2026 Demo No. 3 Demolition Bid - XE3770
Washington State Department of Transportation | State Ferries Long Range Plan public involvementState · Olympia, WA- Due
- Sep 23, 2026
- Deadline passed
- Posted
- Aug 31, 2026
- Primary contact
- Justin Hammond
- (509) 667-2886
The 30-second brief
The Washington State Department of Transportation (WSDOT) is soliciting bids for the SR 28, EWC 2026 Demo No. 3 project (Contract ID XE3770) in Douglas County. The scope of work involves the removal of structures and obstructions, removal and disposal of asbestos material, ESC lead, erosion control, water pollution prevention, bark or wood chip mulch, and installation of high visibility silt fencing. The project includes 12 items and is estimated to take 10 working days under Work Class 13 (Demolition). An optional pre-bid conference is scheduled for September 15, 2026, at 2010 Sunset Highway. Bids are due by 11:00 AM PDT on September 23, 2026, with an estimated value between $125,000 and $150,000. This is a federally funded contract.
Removal of structures, Asbestos disposal, Erosion control, Site cleanup
Unit Bid Analysis
Hear what Washington State Department of Transportation | State Ferries Long Range Plan public involvement plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Washington State Department of Transportation (WSDOT) is soliciting bids for the SR 28, EWC 2026 Demo No. 3 project (Contract ID XE3770) in Douglas County.
The scope of work involves the removal of structures and obstructions, removal and disposal of asbestos material, ESC lead, erosion control, water pollution prevention, bark or wood chip mulch, and installation of high visibility silt fencing. The project includes 12 items and is estimated to take 10 working days under Work Class 13 (Demolition). An optional pre-bid conference is scheduled for September 15, 2026, at 2010 Sunset Highway. Bids are due by 11:00 AM PDT on September 23, 2026, with an estimated value between $125,000 and $150,000. This is a federally funded contract.
EVALUATION CRITERIA
Unit Bid Analysis
REQUIRED DELIVERABLES
4- Removal of structures
- Asbestos disposal
- Erosion control
- Site cleanup
- Submit to
- WSDOT contracting opportunities
- Scope location
- Douglas County, WA
- Reported agency
- Washington State Department of Transportation
Questions about this BID
How do I respond to this Bid from Washington State Department of Transportation | State Ferries Long Range Plan public involvement?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 23, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: WSDOT contracting opportunities. For questions, contact Justin Hammond.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Washington State Department of Transportation | State Ferries Long Range Plan public involvement in WA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Justin Hammond at (509) 667-2886. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Removal of structures, Asbestos disposal, Erosion control, Site cleanup. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Unit Bid Analysis" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Washington State Department of Transportation | State Ferries Long Range Plan public involvement?
All active and historical solicitations from Washington State Department of Transportation | State Ferries Long Range Plan public involvement are tracked and searchable. As a state agency, Washington State Department of Transportation | State Ferries Long Range Plan public involvement regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Washington State Department of Transportation | State Ferries Long Range Plan public involvement for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Douglas County, WA. Review the full solicitation for detailed scope requirements.