WSDOT Enersys 868615-CW-MDL Battery Purchase and Installation Quote - NWR401688R
Washington State Department of TransportationState · Olympia, WA- Due
- Sep 25, 2026
- Deadline passed
- Primary contact
- Zeb Clinton
The 30-second brief
The Washington State Department of Transportation (WSDOT) is soliciting quotes under solicitation NWR401688R for the replacement of batteries at the SR99 Tunnel North Operations Building (NOB). The scope of work includes the disposal of existing batteries, racks, and containment, and the installation of thirty (30) new Enersys 868615-CW-MDL batteries, along with new racks, containment, and a new fused disconnect for the existing charger. A pre-bid conference is scheduled for September 15, 2026, at 10:00 AM, with a deadline for submitting questions by September 16, 2026. Submissions are due by September 25, 2026. The project does not include an inclusion plan.
Thirty new Enersys 868615-CW-MDL batteries, Racks, Containment, Fused disconnect installation
Hear what Washington State Department of Transportation plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Washington State Department of Transportation (WSDOT) is soliciting quotes under solicitation NWR401688R for the replacement of batteries at the SR99 Tunnel North Operations Building (NOB).
The scope of work includes the disposal of existing batteries, racks, and containment, and the installation of thirty (30) new Enersys 868615-CW-MDL batteries, along with new racks, containment, and a new fused disconnect for the existing charger. A pre-bid conference is scheduled for September 15, 2026, at 10:00 AM, with a deadline for submitting questions by September 16, 2026. Submissions are due by September 25, 2026. The project does not include an inclusion plan.
REQUIRED DELIVERABLES
4- Thirty new Enersys 868615-CW-MDL batteries
- Racks
- Containment
- Fused disconnect installation
- Scope location
- Seattle, WA
Questions about this QUOTE
How do I respond to this Quote from Washington State Department of Transportation?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 25, 2026. The solicitation specifies required deliverables that must be addressed in your response. For questions, contact Zeb Clinton.
Can small businesses or minority-owned firms bid on this Quote?
Most government agencies, including Washington State Department of Transportation in WA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Quote submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Zeb Clinton. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Thirty new Enersys 868615-CW-MDL batteries, Racks, Containment, Fused disconnect installation. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from Washington State Department of Transportation?
All active and historical solicitations from Washington State Department of Transportation are tracked and searchable. As a state agency, Washington State Department of Transportation regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Quote?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Washington State Department of Transportation for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Seattle, WA. Review the full solicitation for detailed scope requirements.