RFQCLOSED
Save

WSDOT Columbia River Bridge Replacement Project Progressive Design-Build Services RFQ 2026

Washington State Department of Transportation
Due
Sep 30, 2026
Deadline passed
Posted
Aug 17, 2026
Primary contact
Scotty Ireland
(855) 427-2721

The 30-second brief

What they're buying

The Washington State Department of Transportation (WSDOT) is soliciting qualifications for the design and construction of two new multimodal fixed span bridges on I-5 across the Columbia River. The project utilizes a two-phase Progressive Design-Build delivery method with SOQs due by September 30, 2026.

What you must deliver

Statement of Qualifications, Qualification Forms A-G, Resumes, Project Approach, Organizational Structure

How it's scored

Organizational Structure (100), Past Experience (350), Key Personnel (350), Project Approach (200)

Hear what Washington State Department of Transportation plans next before it's posted.

Get alerts free

Free account · 30-second setup · No credit card

Summary

The Washington State Department of Transportation (WSDOT) is soliciting qualifications for the design and construction of two new multimodal fixed span bridges on I-5 across the Columbia River.

The project utilizes a two-phase Progressive Design-Build delivery method with SOQs due by September 30, 2026.

EVALUATION CRITERIA

Organizational Structure100
Past Experience350
Key Personnel350
Project Approach200

REQUIRED DELIVERABLES

5
  • Statement of Qualifications
  • Qualification Forms A-G
  • Resumes
  • Project Approach
  • Organizational Structure

REQUIRED ATTACHMENTS

5
  • Schedule A
  • Schedule B
  • Schedule C
  • Appendix R
  • Appendix M

REQUIRED STAFFING

6
Project ManagerDesign ManagerConstruction ManagerLead Cost EstimatorEnvironmental Compliance ManagerFSBE Program Administrator
Submit to
WSDOT SFTP site
Scope location
Vancouver, WA

Questions about this RFQ

How do I respond to this RFQ from Washington State Department of Transportation?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 30, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: WSDOT SFTP site. For questions, contact Scotty Ireland.

Can small businesses or minority-owned firms bid on this RFQ?

Most government agencies, including Washington State Department of Transportation in WA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the RFQ submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

Can I ask questions about this solicitation before submitting?

Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Scotty Ireland at (855) 427-2721. Questions and answers are typically shared with all prospective bidders.

What staffing is required for this project?

This solicitation outlines specific staffing requirements. The required roles include: Project Manager, Design Manager, Construction Manager, Lead Cost Estimator, Environmental Compliance Manager, FSBE Program Administrator. Proposers should demonstrate relevant qualifications and experience for each required role.

What are the key deliverables?

The solicitation specifies the following deliverables: Statement of Qualifications, Qualification Forms A-G, Resumes, Project Approach, Organizational Structure. Proposals should clearly address how each deliverable will be met.

Show 4 more questions

What are the evaluation criteria for this solicitation?

This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Organizational Structure (100), Past Experience (350), Key Personnel (350), Project Approach (200)" Vendors should carefully align their proposals with each criterion to maximize their score.

Where can I find more RFPs from Washington State Department of Transportation?

All active and historical solicitations from Washington State Department of Transportation are tracked and searchable. As a state agency, Washington State Department of Transportation regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What documents are required to bid on this RFQ?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Schedule A, Schedule B, Schedule C, Appendix R, Appendix M. Additionally, proposals should address staffing requirements as outlined in the solicitation. Review the full document from Washington State Department of Transportation for the complete list.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: Vancouver, WA. Review the full solicitation for detailed scope requirements.

Work in government? Get Civic IQ free →

Start finding government buyers today.
It's free.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Get started free

No credit card required