West Morgan-East Lawrence Water Authority Water System Reinforcements Bid - Contract 3
- Due
- May 5, 2026
- Deadline passed
The 30-second brief
West Morgan-East Lawrence Water Authority is bidding Contract 3 for water system reinforcements, involving 17,500 total linear feet of ductile iron water main installation in Morgan, AL. Bids are due May 5, 2026.
Fire hydrant assemblies, Air relief/vacuum valve assemblies, Butterfly valves, Service transfers, Road crossings, Creek crossings, Gas line crossings, Driveway surface repairs, Fencing resets, Storm drain resets, Disinfection and testing of installed water line, Connection to existing system
Hear what West Morgan – East Lawrence Water and Sewer Authority plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
West Morgan-East Lawrence Water Authority is bidding Contract 3 for water system reinforcements, involving 17,500 total linear feet of ductile iron water main installation in Morgan, AL. Bids are due May 5, 2026.
REQUIRED DELIVERABLES
12- Fire hydrant assemblies
- Air relief/vacuum valve assemblies
- Butterfly valves
- Service transfers
- Road crossings
- Creek crossings
- Gas line crossings
- Driveway surface repairs
- Fencing resets
- Storm drain resets
- Disinfection and testing of installed water line
- Connection to existing system
- Submit to
- PO Box 2254 2547 Kirby Bridge Rd, Decatur, AL, 35602
- Scope location
- Morgan, AL
- Reported agency
- West Morgan-East Lawrence Water Authority
Questions about this BID
How do I respond to this Bid from West Morgan – East Lawrence Water and Sewer Authority?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is May 5, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: PO Box 2254 2547 Kirby Bridge Rd, Decatur, AL, 35602.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including West Morgan – East Lawrence Water and Sewer Authority in AL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: Fire hydrant assemblies, Air relief/vacuum valve assemblies, Butterfly valves, Service transfers, Road crossings, Creek crossings, Gas line crossings, Driveway surface repairs, Fencing resets, Storm drain resets, Disinfection and testing of installed water line, Connection to existing system. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from West Morgan – East Lawrence Water and Sewer Authority?
All active and historical solicitations from West Morgan – East Lawrence Water and Sewer Authority are tracked and searchable. As a utility district agency, West Morgan – East Lawrence Water and Sewer Authority regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from West Morgan – East Lawrence Water and Sewer Authority for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Morgan, AL. Review the full solicitation for detailed scope requirements.