Utah Department of Transportation Region 2 - F-I80-3(221)117 - I-80; Surplus Canal to I-15
- Due
- Nov 10, 2026
- 7 days left
- Primary contact
- Jessi McIntyre
- (801) 975-4900
The 30-second brief
Utah Department of Transportation Region 2 seeks bids for high-volume rehabilitation on I-80 from Surplus Canal to I-15 in Salt Lake, UT. The project scope includes 1,223 FT of crack sealing, 794 SF of partial depth repair for concrete pavement, 1,380 SF of partial depth repair top off, 296,710 FR of concrete joint control, 48,120 SF of thin bonded polymer overlay Type I, 119,880 SF of polymer overlay removal, 578 FT of compression joint seal Type A modification, 4,228 FT of concrete coating parapet, and 38,149 FT of 6 inch white epoxy pavement marking. This solicitation features federal funding and carries prevailing wage requirements. The submission deadline is November 10, 2026, at 2:00 PM.
1, 223 FT of Crack Sealing; 794 SF of Partial Depth Repair for Concrete Pavement; 1, 380 SF of Partial Depth Repair Top Off; 296, 710 FR of Concrete Joint Control; 48, 120 SF of Thin Bonded Polymer Overlay, Type I; 119, 880 SF of Polymer Overlay Removal; 578 FT of Compression Joint Seal (Type A) Modification; 4, 228 FT of Concrete Coating Parapet; 38, 149 FT of 6" Pavement Marking Epoxy - White
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Utah Department of Transportation Region 2 seeks bids for high-volume rehabilitation on I-80 from Surplus Canal to I-15 in Salt Lake, UT. The project scope includes 1,223 FT of crack sealing, 794 SF of partial depth repair for concrete pavement, 1,380 SF of partial depth repair top off, 296,710 FR of concrete joint control, 48,120 SF of thin bonded polymer overlay Type I, 119,880 SF of polymer overlay removal, 578 FT of compression joint seal Type A modification, 4,228 FT of concrete coating parapet, and 38,149 FT of 6 inch white epoxy pavement marking.
This solicitation features federal funding and carries prevailing wage requirements. The submission deadline is November 10, 2026, at 2:00 PM.
REQUIRED DELIVERABLES
9- 1, 223 FT of Crack Sealing
- 794 SF of Partial Depth Repair for Concrete Pavement
- 1, 380 SF of Partial Depth Repair Top Off
- 296, 710 FR of Concrete Joint Control
- 48, 120 SF of Thin Bonded Polymer Overlay, Type I
- 119, 880 SF of Polymer Overlay Removal
- 578 FT of Compression Joint Seal (Type A) Modification
- 4, 228 FT of Concrete Coating Parapet
- 38, 149 FT of 6" Pavement Marking Epoxy - White
- Submit to
- 2010 S 2760 W, Salt Lake City, UT, 84104
- Scope location
- Salt Lake, UT
- Reported agency
- Utah Department of Transportation
Questions about this BID
How do I respond to this Bid from Utah Department of Transportation | State of Utah?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 10, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: 2010 S 2760 W, Salt Lake City, UT, 84104. For questions, contact Jessi McIntyre.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Utah Department of Transportation | State of Utah in UT, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Jessi McIntyre at (801) 975-4900. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: 1, 223 FT of Crack Sealing; 794 SF of Partial Depth Repair for Concrete Pavement; 1, 380 SF of Partial Depth Repair Top Off; 296, 710 FR of Concrete Joint Control; 48, 120 SF of Thin Bonded Polymer Overlay, Type I; 119, 880 SF of Polymer Overlay Removal; 578 FT of Compression Joint Seal (Type A) Mod. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
Where can I find more RFPs from Utah Department of Transportation | State of Utah?
All active and historical solicitations from Utah Department of Transportation | State of Utah are tracked and searchable. As a state agency, Utah Department of Transportation | State of Utah regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of November 10, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Utah Department of Transportation | State of Utah for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Salt Lake, UT. Review the full solicitation for detailed scope requirements.