Torrington Board of Education Pre-Kindergarten Accessible Playground Equipment Bid 2026
- Due
- Jun 9, 2026
- Deadline passed
- Posted
- May 29, 2026
- Primary contact
- Dean Pergola
The 30-second brief
The Torrington Board of Education is soliciting bids for the design, site preparation, and professional installation of special education accessible playground equipment at Vogel-Wetmore Elementary School. Bids are due June 9, 2026.
Detailed design layout, Equipment list with manufacturer specifications, Proposed site plan, Project timeline, Evidence of insurance coverage, Bid bond, Non-collusion affidavit
Bid pricing, previous record of performance, ability to perform, quality and design, ADA-accessibility, qualifications, project timeline, warranty terms, financial condition
Get notified when Torrington School District posts the next one.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Torrington Board of Education is soliciting bids for the design, site preparation, and professional installation of special education accessible playground equipment at Vogel-Wetmore Elementary School. Bids are due June 9, 2026.
EVALUATION CRITERIA
9- Bid pricing
- Previous record of performance
- Ability to perform
- Quality and design
- ADA-accessibility
- Qualifications
- Project timeline
- Warranty terms
- Financial condition
REQUIRED DELIVERABLES
7- Detailed design layout
- Equipment list with manufacturer specifications
- Proposed site plan
- Project timeline
- Evidence of insurance coverage
- Bid bond
- Non-collusion affidavit
REQUIRED ATTACHMENTS
7- Exhibit A (Bid Form)
- Exhibit B (Non-Collusion Affidavit)
- Exhibit C (Bid Bond)
- Exhibit D (Certification of Compliance)
- Exhibit E (Statement of Qualifications)
- Exhibit F (Form of Contract)
- Exhibit G (Prevailing Wage Rate Information)
REQUIRED STAFFING
19- Submit to
- Torrington Administration Building, 50 Major Besse Drive, Fourth Floor, Torrington, CT 06790
- Scope location
- Torrington, CT
- Projected sq ft
- 1,800 sq ft
- Reported agency
- Torrington Board of Education
Questions about this BID
How do I respond to this Bid from Torrington School District?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is June 9, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: Torrington Administration Building, 50 Major Besse Drive, Fourth Floor, Torrington, CT 06790. For questions, contact Dean Pergola.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Torrington School District in CT, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Dean Pergola. Questions and answers are typically shared with all prospective bidders.
What staffing is required for this project?
This solicitation outlines specific staffing requirements. The required roles include: Boilermaker, Bricklayer, Cement Mason, Plasterer, Stone Mason, Carpenter, Piledriverman, Diver, Millwright, Painter, Electrician, Ironworker, Plumber, Pipefitter, Laborer, Truck Driver, Power Equipment Operator, Surveyor, Lineman. Proposers should demonstrate relevant qualifications and experience for each required role.
What are the key deliverables?
The solicitation specifies the following deliverables: Detailed design layout, Equipment list with manufacturer specifications, Proposed site plan, Project timeline, Evidence of insurance coverage, Bid bond, Non-collusion affidavit. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Bid pricing, previous record of performance, ability to perform, quality and design, ADA-accessibility, qualifications, project timeline, warranty terms, financial condition" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Torrington School District?
All active and historical solicitations from Torrington School District are tracked and searchable. As a school agency, Torrington School District regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Exhibit A (Bid Form), Exhibit B (Non-Collusion Affidavit), Exhibit C (Bid Bond), Exhibit D (Certification of Compliance), Exhibit E (Statement of Qualifications), Exhibit F (Form of Contract), Exhibit. Additionally, proposals should address staffing requirements as outlined in the solicitation. Review the full document from Torrington School District for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Torrington, CT. The total projected area is 1800 sq ft. Review the full solicitation for detailed scope requirements.