The 30-second brief
Sturgeon County invites prospective bidders to submit bids for the 2026-048 Valley Traffic Circle - Drainage Improvements project. The scope of work includes mobilization and demobilization, utility owner notifications and daylighting, traffic accommodation plans, minor vegetation removal, abandoning an existing 250mm concrete storm main and culvert, supplying and installing a new 300mm PVC stormwater line, manholes, and catch basin manholes. Additional work involves removing unsuitable material, grading screened topsoil, relocating rip rap, seeding disturbance areas, and construction debris cleanup. The submission deadline is March 31, 2026.
Mobilization and demobilization; Coordinate all utility owner notifications and daylighting; Submit to the County the traffic accommodation plan (TAC/AT standards); Perform traffic accommodation for the duration of the construction; Minor Vegetation removal; Abandon a section of existing 250mm concrete storm main; Abandon existing culvert; Supply and install new 300mm PVC stormwater line; Supply and install manhole; Supply and install catch basin manhole; Remove excess unsuitable material; Supply and grade screened topsoil top layer; Relocate rip rap; Supply and install seed within disturbance areas; Construction debris cleanup
Hear what Sturgeon County plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Sturgeon County invites prospective bidders to submit bids for the 2026-048 Valley Traffic Circle - Drainage Improvements project.
The scope of work includes mobilization and demobilization, utility owner notifications and daylighting, traffic accommodation plans, minor vegetation removal, abandoning an existing 250mm concrete storm main and culvert, supplying and installing a new 300mm PVC stormwater line, manholes, and catch basin manholes. Additional work involves removing unsuitable material, grading screened topsoil, relocating rip rap, seeding disturbance areas, and construction debris cleanup. The submission deadline is March 31, 2026.
REQUIRED DELIVERABLES
15- Mobilization and demobilization
- Coordinate all utility owner notifications and daylighting
- Submit to the County the traffic accommodation plan (TAC/AT standards)
- Perform traffic accommodation for the duration of the construction
- Minor Vegetation removal
- Abandon a section of existing 250mm concrete storm main
- Abandon existing culvert
- Supply and install new 300mm PVC stormwater line
- Supply and install manhole
- Supply and install catch basin manhole
- Remove excess unsuitable material
- Supply and grade screened topsoil top layer
- Relocate rip rap
- Supply and install seed within disturbance areas
- Construction debris cleanup
- Submit to
- https://sturgeoncounty.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/3928f415-655d-4b92-86d3-fd337d8970ea
- Scope location
- Public
Questions about this BID
How do I respond to this Bid from Sturgeon County?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is March 31, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: https://sturgeoncounty.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/3928f415-655d-4b92-86d3-fd337d8970ea.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Sturgeon County in AB, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: Mobilization and demobilization; Coordinate all utility owner notifications and daylighting; Submit to the County the traffic accommodation plan (TAC/AT standards); Perform traffic accommodation for the duration of the construction; Minor Vegetation removal; Abandon a section of existing 250mm concr. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from Sturgeon County?
All active and historical solicitations from Sturgeon County are tracked and searchable. As a county agency, Sturgeon County regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Sturgeon County for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Public. Review the full solicitation for detailed scope requirements.