South Dakota Department of Transportation - US Highway 212 Structure Replacement and Grading - NH-B 0212(194)266 (2026)
South Dakota Department of Transportation | All other boardsState · Pierre, SD- Due
- Oct 7, 2026
- Deadline passed
- Posted
- Sep 11, 2026
- Primary contact
- South Dakota Department Of Transportation
Hear what South Dakota Department of Transportation | All other boards plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Structure replacement, approach grading, asphalt concrete surfacing, right-of-way plans, and ADA curb ramp construction on US Highway 212 in Faulk County, South Dakota (Project NH-B 0212(194)266, PCN 05H1).
The work encompasses unclassified excavation, structure excavation, class E asphalt concrete, structural steel, reinforcing steel, prestressed concrete beams, riprap, erosion control, pavement marking, and related highway construction items over a gross length of 1.399 miles. Bids are due by October 7, 2026, submitted via the SDEBS portal. Contractors must comply with updated Electronic Standard Specifications for Roads and Bridges (10-7-26 Version), Buy America provisions under Section 6.9, and FHWA-1273 requirements.
- Submit to
- SDEBS portal
- Scope location
- Faulk County, SD
- Reported agency
- South Dakota Department of Transportation
Questions about this BID
How do I respond to this Bid from South Dakota Department of Transportation | All other boards?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is October 7, 2026. Submissions should be delivered to: SDEBS portal. For questions, contact South Dakota Department Of Transportation.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including South Dakota Department of Transportation | All other boards in SD, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is South Dakota Department Of Transportation. Questions and answers are typically shared with all prospective bidders.
Show 3 more questions
Where can I find more RFPs from South Dakota Department of Transportation | All other boards?
All active and historical solicitations from South Dakota Department of Transportation | All other boards are tracked and searchable. As a state agency, South Dakota Department of Transportation | All other boards regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from South Dakota Department of Transportation | All other boards for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Faulk County, SD. Review the full solicitation for detailed scope requirements.