Portland State University FAB Generator Replacement CM/GC Services RFP #1731
Portland State UniversityHigher Ed · Portland, OR- Due
- Dec 20, 2024
- Deadline passed
- Posted
- Nov 15, 2024
Get notified when Portland State University posts the next one.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Portland State University is soliciting proposals for Construction Manager/General Contractor (CM/GC) services under RFP #1731 for the Fourth Avenue Building (FAB) Generator Replacement project.
The scope of work includes the removal of an existing single 3MW turbine and the installation of one new 1.0 to 1.75 MW diesel generator along with its associated infrastructure. The project involves mechanical and electrical upgrades, structural considerations, and potential asbestos/hazardous materials management. Required attachments include technical design standards, concept designs, and various contract templates. Proposals are due by December 20, 2024, at 2:00 PM.
REQUIRED ATTACHMENTS
RFP #1731 FAB Generator Replacement.pdf, Appendix 4.1 - PSU Sample CMGC Contract.pdf, Appendix 4.2 - PSU General Conditions.pdf, Appendix 4.3 - PSU Supplemental General Conditions.pdf, Appendix 4.4 - PSU Division 01.pdf, Appendix 4.5 - PSU Technical Design Standards.pdf, Appendix 4.6 - PSU - FAB Generator Replacement - 15% Concept Design.pdf, Appendix 4.14 - PSU - FAB Generator Replacement - 50% Design.pdf, Appendix 4.15 - FAB Asbestos and Hazardous Materials Reports.zip, Appendix 4.18 - Preconstruction Services Worksheet.xlsx, Appendix 4.19 - CMGC Expense Worksheet.xlsx, Appendix 4.20 - CMGC Work Cost Matrix.xlsx, Appendix 4.21 - Labor Rates Template.xlsx
Questions about this RFP
How do I respond to this RFP from Portland State University?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 20, 2024. Be sure to include all required attachments as outlined in the solicitation.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Portland State University in OR, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Show 2 more questions
Where can I find more RFPs from Portland State University?
All active and historical solicitations from Portland State University are tracked and searchable. As a higher ed agency, Portland State University regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: RFP #1731 FAB Generator Replacement.pdf, Appendix 4.1 - PSU Sample CMGC Contract.pdf, Appendix 4.2 - PSU General Conditions.pdf, Appendix 4.3 - PSU Supplemental General Conditions.pdf, Appendix 4.4 -. Review the full document from Portland State University for the complete list.