Port of Bremerton - Port Orchard Marina Breakwater Replacement, Re-Bid - 03-15-0224-R (2026)
Port Of BremertonPublic Authority · Bremerton, WA- Due
- Nov 24, 2026
- 21 days left
- Posted
- Oct 27, 2026
- Primary contact
- Ellen Ataie
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The Port of Bremerton is requesting bids for the Port Orchard Marina Breakwater Replacement project, identified as project number 03-15-0224-R, with an estimated cost of $20,000,000 to $25,000,000.
The work includes new north and east breakwaters, approach floats, a new gangway, and demolition of existing structures and utilities. Utility infrastructure involves dock water systems, dock fire systems, sewer forcemain, electrical, and upland utility work with temporary erosion and sediment control (TESC), site restoration, paving, landscaping, and potential demolition of two timber piers. Bids are due by November 24, 2026, with questions due by November 16, 2026, and require electronic submission through MRSC Rosters along with a hard copy bid bond. Prevailing wage requirements and Davis-Bacon Act provisions apply, and the project is supported by federal and state funding.
REQUIRED ATTACHMENTS
bid bond
- Submit to
- https://mrscrosters.bonfirehub.com
- Scope location
- Bremerton, WA
- Reported agency
- Port of Bremerton
Questions about this BID
How do I respond to this Bid from Port Of Bremerton?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 24, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: https://mrscrosters.bonfirehub.com. For questions, contact Ellen Ataie.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Port Of Bremerton in WA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Ellen Ataie. Questions and answers are typically shared with all prospective bidders.
Show 4 more questions
Where can I find more RFPs from Port Of Bremerton?
All active and historical solicitations from Port Of Bremerton are tracked and searchable. As a public authority agency, Port Of Bremerton regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of November 24, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: bid bond. Review the full document from Port Of Bremerton for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Bremerton, WA. Review the full solicitation for detailed scope requirements.