King County - Shoreline Transfer Station Dust Control Project - KC001711 - 2026
- Due
- Nov 12, 2026
- 9 days left
- Posted
- Oct 28, 2026
- Primary contact
- Leeann Snyder
The 30-second brief
King County is soliciting construction bids for the Shoreline Transfer Station Dust Control Project, reference KC001711. The scope of work entails installing a new dust control system, which includes constructing a steel partition wall on the mezzanine over the tipping floor, adding misting system modifications with a new pump, air compressor, sensors, controls, programming, testing, and commissioning. Additional tasks involve installing a supply fan and tying it into existing controls, demolishing a duct hood, capping ducting, testing and balancing the office area HVAC system, and repairing a damaged air barrier. Bids are due by November 12, 2026.
Installation of a steel partition wall on mezzanine over tipping floor, Construct and install misting system modifications including new pump, Air compressor, Sensors, Control, Programming, Testing and commissioning, Installation of supply fan and tie into existing controls, Demolition of duct hood and cap ducting, Test and balance HVAC system in office area, Repair damaged section of air barrier
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
King County is soliciting construction bids for the Shoreline Transfer Station Dust Control Project, reference KC001711.
The scope of work entails installing a new dust control system, which includes constructing a steel partition wall on the mezzanine over the tipping floor, adding misting system modifications with a new pump, air compressor, sensors, controls, programming, testing, and commissioning. Additional tasks involve installing a supply fan and tying it into existing controls, demolishing a duct hood, capping ducting, testing and balancing the office area HVAC system, and repairing a damaged air barrier. Bids are due by November 12, 2026.
REQUIRED DELIVERABLES
Installation of a steel partition wall on mezzanine over tipping floor, Construct and install misting system modifications including new pump, Air compressor, Sensors, Control, Programming, Testing and commissioning, Installation of supply fan and tie into existing controls, Demolition of duct hood and cap ducting, Test and balance HVAC system in office area, Repair damaged section of air barrier
- Submit to
- [email protected]
Questions about this BID
How do I respond to this Bid from King County?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 12, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: [email protected]. For questions, contact Leeann Snyder.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including King County in WA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Leeann Snyder. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Installation of a steel partition wall on mezzanine over tipping floor, Construct and install misting system modifications including new pump, Air compressor, Sensors, Control, Programming, Testing and commissioning, Installation of supply fan and tie into existing controls, Demolition of duct hood. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from King County?
All active and historical solicitations from King County are tracked and searchable. As a county agency, King County regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of November 12, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from King County for the complete list.