Jordan Basin Improvement District Multiple Mountain View Corridor Sewer Projects - Bid 2026
- Due
- Sep 15, 2026
- Deadline passed
- Primary contact
- John Gallagher
- (801) 571-1166
The 30-second brief
Jordan Basin Improvement District invites bids for the Multiple Mountain View Corridor Sewer Projects in Salt Lake, UT. The scope of work includes 500 LF of 18-inch sewer, 434 LF trenchless construction guided bore with 36-inch steel casing, 31 ft maximum sewer excavation and construction, 2,610 LF of 30-inch sewer, 237 LF and 105 LF trenchless construction guided bores with 42-inch steel casing, and 26 ft maximum sewer excavation and construction. Submission deadline is September 15, 2026 at 2:00 PM. A Q&A deadline is set for September 11, 2026 at 1:00 PM. Local funding applies. Submissions must be delivered to 1253 West Jordan Basin Lane, Riverton, UT, 84065.
500 LF of 18" sewer, 434 LF trenchless construction guided bore (36" steel casing), 31 ft maximum sewer excavation, Construction, 2, 610 LF of 30" sewer, 237 LF trenchless construction guided bore (42" steel casing), 105 LF trenchless construction guided bore (42-inch steel casing), 26 ft maximum sewer excavation, Construction
Hear about the next one before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Jordan Basin Improvement District invites bids for the Multiple Mountain View Corridor Sewer Projects in Salt Lake, UT. The scope of work includes 500 LF of 18-inch sewer, 434 LF trenchless construction guided bore with 36-inch steel casing, 31 ft maximum sewer excavation and construction, 2,610 LF of 30-inch sewer, 237 LF and 105 LF trenchless construction guided bores with 42-inch steel casing, and 26 ft maximum sewer excavation and construction.
Submission deadline is September 15, 2026 at 2:00 PM. A Q&A deadline is set for September 11, 2026 at 1:00 PM. Local funding applies. Submissions must be delivered to 1253 West Jordan Basin Lane, Riverton, UT, 84065.
REQUIRED DELIVERABLES
10- 500 LF of 18" sewer
- 434 LF trenchless construction guided bore (36" steel casing)
- 31 ft maximum sewer excavation
- Construction
- 2
- 610 LF of 30" sewer
- 237 LF trenchless construction guided bore (42" steel casing)
- 105 LF trenchless construction guided bore (42-inch steel casing)
- 26 ft maximum sewer excavation
- Construction
- Submit to
- 1253 West Jordan Basin Lane, Riverton, UT, 84065
- Scope location
- Salt Lake, UT
Questions about this BID
How do I respond to this Bid from Jordan Basin Improvement District?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 15, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: 1253 West Jordan Basin Lane, Riverton, UT, 84065. For questions, contact John Gallagher.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Jordan Basin Improvement District in UT, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is John Gallagher at (801) 571-1166. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: 500 LF of 18" sewer, 434 LF trenchless construction guided bore (36" steel casing), 31 ft maximum sewer excavation, Construction, 2, 610 LF of 30" sewer, 237 LF trenchless construction guided bore (42" steel casing), 105 LF trenchless construction guided bore (42-inch steel casing), 26 ft maximum se. Proposals should clearly address how each deliverable will be met.
Show 2 more questions
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Jordan Basin Improvement District for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Salt Lake, UT. Review the full solicitation for detailed scope requirements.