ITBCLOSED
Save

District of North Vancouver - Culvert Replacement - 5305 Sonora Drive - ITT-013-26 (2026)

District of North Vancouver logoDistrict of North Vancouver
Due
Apr 7, 2026
Deadline passed
Posted
Mar 3, 2026

The 30-second brief

What they're buying

The Corporation of the District of North Vancouver invites tenders for ITT-013-26, Culvert Replacement - 5305 Sonora Drive. The scope of works involves the supply and installation of 24m of 1200mm reinforced concrete pipe, catch basin and leads, headwall structures, and appurtenances. Work also includes removal and off-site disposal of existing catch basin, headwalls, and culvert pipe, as well as installing and maintaining a continuous flow bypass system during construction. Additional tasks comprise creek regrading, placement of rip-rap, stump and tree removals, road surface reinstatement, AC watermain removal, and utility protection.

What you must deliver

Supply and installation of 24m of 1200mm reinforced concrete pipe, Catch basin and leads, Headwall structures, And appurtenances; Removal and off-site disposal of existing catch basin, Headwalls and culvert pipe; Install and maintain a continuous flow bypass system during the construction of the culvert replacement works; Creek regrading and placement of rip-rap; Stump and/or tree removals; Reinstatement of road surface; Removal of AC Watermain, Protection of existing utilities.

Hear what District of North Vancouver plans next before it's posted.

Get alerts free

Free account · 30-second setup · No credit card

Summary

The Corporation of the District of North Vancouver invites tenders for ITT-013-26, Culvert Replacement - 5305 Sonora Drive.

The scope of works involves the supply and installation of 24m of 1200mm reinforced concrete pipe, catch basin and leads, headwall structures, and appurtenances. Work also includes removal and off-site disposal of existing catch basin, headwalls, and culvert pipe, as well as installing and maintaining a continuous flow bypass system during construction. Additional tasks comprise creek regrading, placement of rip-rap, stump and tree removals, road surface reinstatement, AC watermain removal, and utility protection.

REQUIRED DELIVERABLES

7
  • Supply and installation of 24m of 1200mm reinforced concrete pipe, Catch basin and leads, Headwall structures, And appurtenances
  • Removal and off-site disposal of existing catch basin, Headwalls and culvert pipe
  • Install and maintain a continuous flow bypass system during the construction of the culvert replacement works
  • Creek regrading and placement of rip-rap
  • Stump and/or tree removals
  • Reinstatement of road surface
  • Removal of AC Watermain, Protection of existing utilities
Submit to
https://dnv.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/7e79e83d-7689-48ef-a42a-105bab8424a7
Scope location
District of North Vancouver, BC

Questions about this ITB

How do I respond to this ITB from District of North Vancouver?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is April 7, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: https://dnv.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/7e79e83d-7689-48ef-a42a-105bab8424a7.

Can small businesses or minority-owned firms bid on this ITB?

Most government agencies, including District of North Vancouver in BC, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the ITB submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

What are the key deliverables?

The solicitation specifies the following deliverables: Supply and installation of 24m of 1200mm reinforced concrete pipe, Catch basin and leads, Headwall structures, And appurtenances; Removal and off-site disposal of existing catch basin, Headwalls and culvert pipe; Install and maintain a continuous flow bypass system during the construction of the cul. Proposals should clearly address how each deliverable will be met.

Show 3 more questions

Where can I find more RFPs from District of North Vancouver?

All active and historical solicitations from District of North Vancouver are tracked and searchable. As a city agency, District of North Vancouver regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What documents are required to bid on this ITB?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from District of North Vancouver for the complete list.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: District of North Vancouver, BC. Review the full solicitation for detailed scope requirements.

Work in government? Get Civic IQ free →

Start finding government buyers today.
It's free.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Get started free

No credit card required